首页> 外文会议>International Seminar on Operational Excellence in Mining >Optimizing Fleet Maintenance Strategy under Business Cycle Uncertainty
【24h】

Optimizing Fleet Maintenance Strategy under Business Cycle Uncertainty

机译:在商业周期不确定性下优化舰队维护策略

获取原文

摘要

Physical asset management is greatly affected by business cycle uncertainty. The main sources of uncertainty in asset-intensive industries such as mining are associated with external factors (i.e. market conditions) and internal factors (occurrence of failures, processing times, production rates, etc.). This scenario results in risks for operations that complicate decision making. One way to handle uncertainty is to use real options analysis (ROA). This technique allows to implement flexible decision-making that minimizes risk and offers the possibility to add value by taking advantage of uncertainty. Its application in engineering decision making is quite low in general, and even more in maintenance. This paper proposes an original model to set a flexible fleet maintenance strategy using ROA. We consider two main sources of uncertainty: commodity price volatility and component reliability. The method considers two stages: firstly, an optimum time between overhauls is determined at each period of time; and secondly, the option of deferring maintenance in a certain amount of time is evaluated. The case study considers a fleet of mining equipment. The application of this model increased net present value of a ten-year time span by 12 %.
机译:物理资产管理受到商业周期不确定性的大大影响。矿业等资产密集型产业中的不确定性的主要原因与外部因素(即市场状况)和内部因素(故障发生,加工时间,生产率等)有关。这种情况导致对复杂决策制定的操作的风险。处理不确定性的一种方法是使用真实的选项分析(ROA)。该技术允许实现灵活的决策,从而最大限度地减少风险,并通过利用不确定性来提供增加价值的可能性。它在工程决策中的应用通常一般,甚至更具维护。本文提出了一种原创模型,可以使用ROA设置灵活的舰队维护策略。我们考虑两个主要不确定性来源:商品价格波动和元件可靠性。该方法考虑两个阶段:首先,在每个时间段确定横向之间的最佳时间;其次,评估在一定时间段内推迟维护的选择。案例研究考虑了一批采矿设备。该模型的应用增加了十年时间的净值增加了12%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号