Obtaining and Integrating Data for Productivity Management in Earthmoving Operations Contracts

机译:在地耕运营合同中获取和整合生产力管理数据

获取原文

摘要

Traditionally, the earthmoving process in construction contracts does not have online measurement systems with a focus on the identification of waste and improvement of productivity. Usually, the travel control is done manually (card checker); the hours used are recorded by the same operator; if you have a GPS device, it is limited to controlling the velocity; and if the company hires a fleet control system, it is limited to controlling fuel consumption, preventive maintenance, and others. Clearly, no sufficient information to improve productivity was available; therefore, a new project to cover outstanding matters was conducted. This paper presents the work that was carried out in the project mentioned above. In this project, the technical bases of the main contract have included requirements for the control of earthmoving equipment that ensures data collection by GPS and CAN Bus Monitor of the truck, integrating all the information in a single, web-based platform that delivers the KPIs (or Key Process Indicators). These requirements enable reliable recognition of the use and performance of the equipment with a sufficient level of detail to allow determination of the causes of variations in the performance of the sub processes (loading, transport and unloading). The implementation of this measurement system has revealed shortcomings that were previously invisible to the client and, to a lesser degree, to the contractor, as well as allowing us to jointly manage the project and improve productivity. Therefore, it has allowed to quickly adopt the “Lean Full Potential” methodology that manages focusing on improvement of value-adding process, achieving significant productivity gain.
机译:传统上,施工合同中的地球工艺在线测量系统没有重点识别废物和生产力的提高。通常,行程控制是手动完成的(卡检查器);使用的时间由同一运营商记录;如果您有GPS设备,则仅限于控制速度;如果公司雇用车队控制系统,则仅限于控制燃料消耗,预防性维护等。显然,没有足够的信息来提高生产力;因此,进行了一个涵盖未决事项的新项目。本文介绍了上述项目中进行的工作。在这个项目中,主要合同的技术基础包括控制地球移动设备的要求,该设备可确保GPS和CAN卡车的数据集合,集成了传送KPI的单个Web的平台中的所有信息(或关键过程指标)。这些要求可以可靠地识别设备的使用和性能,具有足够的细节水平,以允许确定子进程性能的变化的原因(加载,传输和卸载)。该测量系统的实施揭示了以前对客户不可见的缺点,并在较小程度到承包商,允许我们共同管理项目并提高生产力。因此,它允许快速采用“精益全潜力”方法,该方法专注于改善价值加法,实现显着的生产力增益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号