首页> 外文会议>Annual International Workshop on Materials Science and Engineering >Transfer Potential and Scheme Optimization of the Central Encryption Well Area of Block A-1
【24h】

Transfer Potential and Scheme Optimization of the Central Encryption Well Area of Block A-1

机译:转移潜力和方案优化块A-1的中央加密井区域

获取原文

摘要

After the encryption adjustment in the central encryption well area of block A-1,the production in the well area is improved,but at the same time,the production decline of old wells in the well area is accelerated,and water injection is not effective in some oil wells.In order to improve the wells development effect,the adjustment of injection-production system in this well area is analysed in detail,three transfer schemes are designed,the feasibility of different schemes is compared and analysed,it is preferred to select scattered transfer as the best transfer scheme.
机译:在块A-1的中央加密井面积中加密调整后,井面积的生产得到改善,但同时,井面积的旧井的生产衰落加速,注水并不有效在一些油井中,为了提高井的发展效果,详细分析了该井区域注射生产系统的调整,设计了三种转移方案,比较了不同方案的可行性和分析,优选选择分散的传输作为最佳的转移方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号