首页> 外文会议>International Symposium on Advances in Electrical, Electronics and Computer Engineering >Optimization Method of Technical Solutions in Premium Power Park Considering Customers' Power Quality Demand
【24h】

Optimization Method of Technical Solutions in Premium Power Park Considering Customers' Power Quality Demand

机译:优质电力园技术解决方案的优化方法考虑客户的电力质量需求

获取原文

摘要

Premium Power Park (PPP) is a technical solution to solve the regional high-quality power supply problems. The technical optimization method is the premise of planning and constructing. To meet various power demands of different customers, the concept of process immunity time is lead up in this paper. Considering the response characteristic of process to sag and the variation curve of physical parameters, the method of quantification for customers' power quality demands is proposed. On this basis, optimization model is established by constraints of customers' demands and taking the minimum cost as the objective. And its corresponding algorithm based on Tabu search method is researched. The proposed method is applied to a typical PPP and it is proved to be accurate and valid. The results show that this method can meet each customer's demand, meanwhile, ensure the minimum of total investment.
机译:优质电源公园(PPP)是解决区域高质量电源问题的技术方案。技术优化方法是规划和构建的前提。为满足不同客户的各种电力需求,本文提出了过程免疫时间的概念。考虑到过程的响应特性和物理参数的变化曲线,提出了客户功率质量要求的量化方法。在此基础上,优化模型是通过客户需求的限制建立,并以最低成本为目标。及其基于禁忌搜索方法的相应算法。所提出的方法应用于典型的PPP,证明是准确和有效的。结果表明,该方法可以满足每个客户的需求,同时确保最低投资。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号