首页> 外文会议>International Symposium on Advances in Electrical, Electronics and Computer Engineering >Application of Set Pair Analysis on QPE and Rain Gauge in Flood Forecasting
【24h】

Application of Set Pair Analysis on QPE and Rain Gauge in Flood Forecasting

机译:集对分析对洪水预报QPE和雨量仪的应用

获取原文

摘要

This paper, taking Bailianhe reservoir basin on Hubei province as an example, firstly used the method of set pair analysis to calibrate the radar estimates rainfall combined with basin rain gauge. We obtained the optimal Z-I relationship of Bailianhe reservoir. Then, it presented a method of weight calibration based on radar estimation and rain gauge, combined with the advantage of the rainfall station at grid point observations and the radar to estimate the rainfall distribution. The method was used to analyze a rainfall process on Bailianhe basin in June 2004, compared with other rainfall estimation methods at last. The results showed that this method has certain effect on improving the precision of flood forecasting.
机译:本文以湖北省贝利亚海水库盆地为例,首先利用了集对分析的方法来校准雷达估计降雨结合盆地雨量仪。我们获得了Bailianhe水库的最佳Z-I关系。然后,它提出了一种基于雷达估计和雨量计的重量校准方法,结合了网格点观测和雷达的降雨站的优势,以估计降雨分布。该方法用于分析2004年6月对贝尔安海盆地的降雨过程,与其他降雨估计方法相比。结果表明,该方法对提高洪水预测的精度具有一定的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号