首页> 外文会议>International Forum on Energy, Environment and Sustainable Development >Liquefaction and Settlement Analysis of Silt Soil Foundation in High Earthquake Intensity Region
【24h】

Liquefaction and Settlement Analysis of Silt Soil Foundation in High Earthquake Intensity Region

机译:高地震强度区域淤泥土基础液化与沉降分析

获取原文

摘要

The under-crossing tunnel of east external ring of Kunming is one of the most important projects of the Kunming south railway station hub construction. Two layers of silt soil are found in tunnel mileage K2+100-K2+200 and one of them is just under the tunnel floor. Since the project is on high seismic intensity region and the silt soil foundation is easy to be liquefied, it is important to analysis the liquefaction and settlement of the silt soil foundation. In the paper, the whole process of silt soil foundation liquefaction and settlement analysis is presented based on finite difference method. The results indicate that the silt soil foundation will not be liquefied under the design seismic load and the settlement of the silt soil foundation is satisfied.
机译:昆明东外外环的过境隧道是昆明南火车站枢纽建设中最重要的项目之一。在隧道里程K2 + 100-k2 + 200中发现两层淤泥土壤,其中一层位于隧道楼层。由于该项目处于高地震强度区域,淤泥土壤基础易液化,重要的是分析淤泥土壤基础的液化和沉降。本文基于有限差分法提出了淤泥土液化液化和沉降分析的全过程。结果表明,淤泥土基础在设计地震载荷下不会液化,满足淤泥土壤基础的沉降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号