Closure Planning Lessons Learnt from the Century Mine

机译:从世纪矿区汲取的封闭计划经验

获取原文

摘要

The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans were developed from 2006, and detailed planning for closure commenced in early 2011 with the appointment of a dedicated closure planning resource. The site will continue to be managed during the active and passive closure phases to complete rehabilitation commitments and demonstrate that closure completion criteria have been achieved.Completion of the mining/processing phase of the project provides an opportunity to reflect on successes, missed opportunities and lessons learnt with respect to planning and execution of mine closure. This paper highlights examples of success at Century and also identifies key learnings and areas for improvement in progressive closure outcomes. Specific examples examine mine planning and execution involving bulk movement of waste rock and construction of permanent waste encapsulation landforms. The paper also provides recommendations for other sites that are planning for closure.Decisions made during the operational phase of the project life can result in a significant increase in closure liability and reduce the likelihood of achieving lease relinquishment. Likewise, it is of paramount importance to assess the consequences and thoroughly understand the risks associated with changes or deferral of closure plans, progressive rehabilitation targets and closure related key performance indicators.
机译:Mmg Century Mine是澳大利亚最大的锌/铅矿,于1999年开始运营,并于2015年7月停止开采,加工于2016年初完成。从2006年开发了关闭计划,并详细计划于2011年初开始,任命专门的闭幕规划资源。该网站将在主动和被动闭环阶段继续进行管理,以完成康复承诺,并证明已经实现了关闭完成标准。项目的采矿/处理阶段提供了机会,以反思成功,错过机会和课程关于矿井闭幕的规划和执行,了解。本文突出了世纪成功的例子,也识别了渐进式封闭成果的改进的关键学习和领域。具体实例检查矿山规划和执行涉及废弃物岩石的散装运动和永久废物封装地貌的建设。本文还为正在计划闭幕的其他网站提供建议。项目寿命的运营阶段制作的特点可能导致关闭责任的重大增加,减少实现租赁放弃的可能性。同样,评估后果并彻底了解与闭幕计划的变更或延期相关的风险,渐进式康复目标和闭幕相关关键绩效指标,这一点至关重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号