DRAGLINE EXTRACTION OF 1.2 MILLION TONNES OF A 52-METER THICK VERTICALLY DIPPING COAL SEAM

机译:拖拉机提取120万吨的52米厚的垂直浸煤煤层

获取原文

摘要

From November 2014 through September 2016, Westmoreland's Coal Valley Mine utilized a Marion 7450 electric walking dragline to extract 1.2 million tonnes of a vertically-dipping, 52-meter wide, fault-thickened seam, beneath a conventionally-excavated pit bottom. Mine planning and operational hurdles encountered throughout a kilometer of mined strike length included mitigating highwall instability in both hanging and footwall slopes, water management, and end-of-life machine reliability and maintenance. The most substantial challenge has been the depressed global coal market. However, the successful application of this mining method significantly aided the overall cost of production at the site. The valuable experience gained from this project will be extended to future mining areas where this technique can be similarly applied.
机译:从2014年11月到2016年9月,威斯莫尔兰的煤谷矿利用MARION 7450电动行走龙,以提取120万吨垂直浸渍,52米宽,故障加厚的缝,在常规挖掘的坑下方。矿山规划和运营障碍在整个公里的罢工长度遇到,包括减轻悬挂和鞋坡坡,水管理和寿命结束机可靠性和维护中的高墙不稳定。最重要的挑战是抑郁的全球煤炭市场。然而,这种采矿方法的成功应用显着促进了现场生产的总体生产成本。从该项目中获得的宝贵经验将扩展到未来的挖掘区域,其中可以类似地应用这种技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号