首页> 外文会议>SPE Thermal Well Integrity and Design Symposium >SAGD Circulation Phase: Thermal Efficiency Evaluation of Five Wellbore Completion Designs in Lloydminster Reservoir
【24h】

SAGD Circulation Phase: Thermal Efficiency Evaluation of Five Wellbore Completion Designs in Lloydminster Reservoir

机译:SAGD循环阶段:LLOYDMINSTER水库五大井筒完工设计的热效率评价

获取原文

摘要

The main objective during the circulation phase (start-up) of Steam Assisted Gravity Drainage (SAGD) is to lower the heavy oil or bitumen viscosity, to create inter-well fluid communication between the injector and producer well and to uniformly warm-up the lateral section of the well pair to achieve uniform steam chamber growth during the life of the SAGD well pair. Typically, the circulation phase (start-up) lasts between three and six months and it is completed when the temperature between the producer and injector is high enough, generally greater than 80°C. It has been proven that during the circulation phase (start-up) of a SAGD well pair, the variations in thermal efficiency result from factors such as tubing size, well trajectory, well length, completion configuration, reservoir properties, and operating parameters.
机译:蒸汽辅助重力引流(SAGD)循环阶段(启动)的主要目标是降低重油或沥青粘度,以良好地产生喷射器和生产者之间的井间流体连通,并均匀地预热井对的横截面,以实现均匀的蒸汽室生长在SAGD阱对的寿命期间。通常,循环阶段(启动)在三到六个月之间持续,并且当生产者和注射器之间的温度足够高时,通常大于80℃。已经证明,在SAGD井对的循环阶段(启动)期间,热效率的变化是由管尺寸,井轨道,井长度,完井配置,储层性能和操作参数等因素产生的因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号