Avoiding Pitfalls in Combined Cycle Plant Design

机译:避免组合循环厂设计中的陷阱

获取原文

摘要

Modern combined-cycle gas turbine (CCGT) power plants are very complex systems where a large variety of hardware, software, and firmware comes together and works in harmony – or does it More often than not, CCGTs are developed by people with limited or no technical background. Naturally they rely on teams of engineers – Engineering, Procurement, and Construction (EPC) contractor, Original Equipment Manufacturer (OEM), Owner’s Engineer, or in-house engineering – to design and “optimize” the plant. As different parts of the plant comes from various vendors and from many different countries, the engineers frequently find themselves in the middle of opposing arguments – minimize capital expenditure (capex), minimize heat rate (maximize efficiency), maximize reliability and build quality, etc….How does one “optimize” such a complex structure
机译:现代综合循环燃气轮机(CCGT)发电厂是非常复杂的系统,其中各种硬件,软件和固件汇集在一起,并与之和谐作用 - 或者更频繁地进行,CCGT由有限公司或否的人开发 技术背景。 当然,他们依靠工程师团队 - 工程,采购和建筑(EPC)承包商,原始设备制造商(OEM),所有者的工程师或内部工程 - 设计和“优化”工厂。 由于该工厂的不同部分来自各种供应商以及来自许多不同的国家,工程师经常在反对论点中发现自己 - 最大限度地减少资本支出(CAPEX),最大限度地减少热速率(最大限度地提高效率),最大限度地提高可靠性和构建质量等 ......以及如何“优化”这种复杂的结构

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号