In line with an escalation of drilling operations in East Africa, operators and service contractors are increasing their focus on how to make operations more efficient in challenging market. One operation for which a robust, safe, and effective tool was utilized to increase efficiency is the plug and abandonment of deepwater exploration wells in Tanzania and Kenya. Traditional abandonment of a well is accomplished by stacking multiple cement plugs to achieve zonal isolation. The plugs covering reservoir sections are normally independently verified in keeping with best practices applicable to well barriers. By setting longer plugs to cover multiple zones, rig time and operating costs can be significantly reduced. However, there are limitations to cement plug length when set conventionally without significantly increasing the risk of stuck pipe. The Hydraulic Tubing Release Tool (HTRT) was introduced during a deep-water exploration campaign in East Africa. It has been used successfully during the abandonment of five different wells where seven plug and abandonment operations placed long abandonment plugs, ranging from 405m to 1787m, in a single operation. The utilization of the tubing release tool system in well abandonment operations has proved to lower the risks and operational costs through the reduction of necessary cementing operations. With the sacrificial tubing being left in the cement, there is less risk of plug contamination which occurs as a result of pulling out of the plug. It also allows for longer plugs to be set in a single operation as opposed to stacking several cement plugs to get the required length, saving additional time. It has been used successfully on five deepwater wells in East Africa to set long abandonment plugs in open holes ranging from 700m to 1800m MD. The main objective of the disconnect system is to shorten the time taken to perform a well abandonment program as well as reducing the associated risks, thereby saving rig time and money.
机译:根据东非的钻井业务升级,运营商和服务承包商正在增加他们对如何在挑战性市场中更有效的操作的关注。利用强大,安全和有效工具来提高效率的一个操作是坦桑尼亚和肯尼亚的深水勘探井的插头和放弃。通过堆叠多个水泥插头来实现区域隔离来实现传统的放弃井。覆盖储存器部分的插头通常独立验证,以保持适用于良好障碍的最佳实践。通过设置较长的插头来覆盖多个区域,可以显着降低钻机时间和运营成本。然而,当常规设置时,在常规设置时,水泥插头长度存在局限性,而不会显着增加卡住管道的风险。在东非的深水勘探活动期间引入了液压管释放工具(HTRT)。在放弃五个不同的井期间,它已成功使用,其中七个插头和遗弃操作放置长的放弃插头,在一次操作中从405米到1787米。通过减少必要的胶结操作,已经证明了在放弃操作中的管道释放工具系统的利用率降低了风险和运行成本。随着牺牲管子留在水泥中,塞子污染的风险越来越少,由于拉出插头而发生。它还允许在单个操作中设置更长的插头,而不是堆叠几个水泥插头以获得所需的长度,节省额外的时间。它已在东非的五个深水井上成功使用,以设定长时间的漏洞,从700米到1800米MD。断开系统的主要目标是缩短执行井放弃计划的时间以及减少相关风险,从而节省了钻机时间和金钱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号