首页> 外文会议>SPE/AAPG Africa Energy and Technology Conference >Novel Well Flow-control Valve for Flexible Well Completion and Application in Commingled Production of Oil and Gas in West Africa
【24h】

Novel Well Flow-control Valve for Flexible Well Completion and Application in Commingled Production of Oil and Gas in West Africa

机译:新型井流量控制阀,用于柔性井完成和应用在西非石油和天然气的制作中的应用

获取原文

摘要

This paper presents the development, qualification and field trial of a novel well flow valve that delivers unlimited zonal selectivity in single skin lower completion without the use of control lines. Control lines have limitations and risks due to complexity during deployment, restrictions on the number of zones, complications with liner hanger feed thru and associated wet connects. It is desirable to remove the control lines whilst maintaining the functionality of multi zone, variable choke flow control. The well flow valve is a full-bore, reliable and robust mechanically operated sleeve, qualified in accordance with ISO14998 including multiple open/close cycles, at a sustained unloading pressure of 1,500 psi, with highly customizable flow ports. The need for such a solution was identified by an operator in West Africa. The well objective was elevated from a gas producer to a well that required the flexibility to produce gas or oil with gas lift capability. The well flow valve was selected and required on site variable choke capability for both oil and gas production, with choke position verification, ability to handle dirty gas production without risk of plugging, compliant with a high rate and high pressure proppant frac along with ease of operation and long term reliability. The field trial included a high pressure proppant frac in the oil zone. In the shallower gas zone, three well flow valves were used to deliver variable choking capability from maximum gas flow rate with minimal delta P adjusting down to a choke size suitable for gas lift. The well flow valves were operated using a high expansion shifting key conveyed on eline through the 3 1/2” production tubing. The shifting key expanded in the 4 1/2” lower completion to open/close individually all the well flow valves in a single trip. Incorporating this new product overcame the challenges presented and met the objective of commingled production of oil and gas. The well flow control valve demonstrated flexibility through design, supply chain, manufacturing, and operations. This paper will also outline the future road map covering further developments of the well flow valve and its incorporation into an enhanced flexible lower liner solution aimed at lowering well completion costs and risks.
机译:本文介绍了一种新型井流量瓣膜的开发,鉴定和现场试验,在单皮肤上提供无限的区域选择性,在不使用控制线的情况下在整个皮肤下进行。控制线具有由于部署过程中复杂性而有局限性和风险,限制区域数量,衬里吊架馈送的并发症和相关的湿式连接。期望拆下控制线,同时保持多区域的功能,可变扼流流量控制。井流量阀是全孔,可靠且坚固的机械操作的套筒,根据ISO14998合格,包括多个开放式/关闭周期,持续卸载压力为1,500 psi,具有高度可定制的流量端口。在西非的操作员确定了对这种解决方案的需求。本井客观从气体生产者升高到井中,需要灵活地产生气体或油的气体升力能力。在石油和天然气生产的场地可变扼流能力方面选择并要求井流量阀,具有扼流定位验证,能够处理脏气体生产,而不会堵塞风险,符合高速和高压支线FRAC以及易于易于操作和长期可靠性。现场试验包括油区中的高压支撑剂FRAC。在浅气区中,三个井流量阀用于从最大气体流速从最大的气体流速提供可变窒息能力,最小的Delta P调节到适合于燃气升力的扼流尺寸。使用在ELINE上通过3 1/2“生产管道在ELINE上输送的高膨胀转移键操作井流阀。换档键在4 1/2“下完成以在一次行程中单独打开/关闭/关闭。将此新产品纳入挑战并符合油气生产石油和天然气的挑战。井流量控制阀通过设计,供应链,制造和操作来展现灵活性。本文还将概述未来的路线图,涵盖了井流量阀的进一步发展,并将其融入增强的柔性下衬垫解决方案,旨在降低井完成成本和风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号