首页> 外文会议>North American Society for Trenchless Technology no-dig show >Injection Grouts and CIPP Lining Revitalize Buried Assets on Treasure Island
【24h】

Injection Grouts and CIPP Lining Revitalize Buried Assets on Treasure Island

机译:注射灌浆和CIPP衬里恢复了金银岛的埋葬资产

获取原文

摘要

Living and working on a Florida barrier island has its advantages, unless you are the Public Works Director. Treasure Island was born in 1951. This 5.3 square mile, mostly man-made island was created by dredging the Boca Ciega Bay—no clays, no loamy soils—just granular sands and residual from aquatic ecosystem. What does this mean for 17 miles of mainline sewers and laterals serving 6,800 residents and 15,000 seasonal residents? A challenge, but Michael Helfrich (Public Works Director) and Joyce T. Velitschkowski (President of J.T.V., Inc.) gained insight on this project that can be applied anywhere for anyone responsible for trenchless solutions: 1. CIPP Lining and Injection Grouting are not only complementary, but very necessary in this case. 2. Due to severe infiltration, Grout First makes CIPP mainline possible. 3. Grouting joints and lateral connections are most cost-effective. 4. Together, Grouting and Lining provide a more durable, longer-lasting solution. Small communities with limited budgets have to prioritize problems and choose remedies wisely. Treasure Island is a wholesale customer of a large, neighboring municipality and experiences an extremely high surcharge for excessive chlorides. To Helfrich, this could only mean high infiltration of saltwater, and through monitoring pump station data, discovered a gaping hole in a mainline located between a building structure and seawall. Trenchless was the only answer. Injection grouting stopped the active leaks, followed by CIPP Lining and grouting lateral connections. Result? 30% reduction in infiltration and with benefits compounded daily - this was the single best rehab investment Treasure Island could make.
机译:除非您是公共工程导演,否则在佛罗里达州壁垒岛上的生活和工作有利。金银岛出生于1951年。这5.3平方英里,主要是通过疏浚博卡·卡巴湾 - 没有粘土来创造的人造岛屿,没有植物的土壤 - 只有颗粒状沙子和水生生态系统的残留物。这是什么意思为17英里的主线下水道和横向,服务6,800名居民和15,000名季节性居民?挑战,但Michael Helfrich(公共工程总监)和Joyce T.Velitschkowski(JTV,Inc。总裁)在这个项目上获得了洞察力,这些项目可以在任何地方应用于任何负责飞行解决方案的人:1。CIPP衬里和注射灌浆不是只有互补,但在这种情况下非常必要。 2.由于严重渗透,灌浆首先使CIPP主线成为可能。 3.灌浆接头和横向连接最具成本效益。 4.一起灌浆和衬里提供更耐用,更长的解决方案。预算有限的小社区必须优先考虑问题并明智地选择补救措施。金银岛是一个大型,邻近的市政的批发客户,并经历过多的氯化物的高附加费。对于Helfrich,这只能意味着盐水的高渗透,通过监测泵站数据,在位于建筑物结构和海堤之间的主线中发现了一个张大孔。挖掘是唯一的答案。注射灌浆停止了主动泄漏,然后是CIPP衬里和灌浆横向连接。结果?减少30%的渗透和益处每日复合 - 这是单一最好的康复投资宝藏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号