Profiled High Risk - No Threat to Gilboa Low Level Outlet Microtunnel Design and Construction Project

机译:令人发知的高风险 - 对Gilboa低级出口Microtunnel设计和建筑项目没有威胁

获取原文

摘要

Gilboa Dam, in upstate New York, impounds Schoharie Creek to form the Schoharie Reservoir. Constructed in 1929, it is the northernmost reservoir in the Catskill System of the New York City water supply system. To ensure the dam’s continued long-term performance and reliability, the New York City Department of Environmental Protection (NYCDEP) embarked on a reconstruction program to extend the dam’s service life under the current New York State Department of Environment Conservation (NYSDEC) dam safety guidelines. NYCDEP is constructing a Low-Level Outlet (LLO) to facilitate the ability to drain the reservoir to meet NYSDEC dam safety requirements and to provide an ability to make conservation releases. The project has been advanced through stages of risk evaluation from planning through engineering design and is now in the construction phase. The LLO consists of two 108-inch-diameter tunnels (a water leg and a land leg), ultimately terminating at a new valve chamber that will release water to the Schoharie Creek downstream. The two tunnels are approximately 2,160 linear feet combined, and are designed to be completed using trenchless microtunneling construction methods. When the water leg is mined into the receiving site at the bottom of the reservoir at 153 feet below normal pool water level, retrieval of the microtunnel boring machine (MTBM) will be completed via wet retrieval methods. This paper presents the project’s risk profile, and the risk management approach adopted in the delivery of the project.
机译:吉尔博亚大坝,在纽约州北斯特泰特省,占Schoharie Creek,形成了Schoharie水库。建于1929年,是纽约市供水系统Catskill系统中的最北端的水库。为确保大坝的持续长期绩效和可靠性,纽约市环保(纽约)探讨了重建计划,以扩大当前纽约环境保护部(NYSDEC)大坝安全指南下的大坝的使用寿命。 NYCDEP正在构建低级出口(LLO),以促进排出水库以满足NYSDEC大坝安全要求的能力,并提供制作保护释放的能力。该项目通过通过工程设计计划的风险评估阶段进行了高级,现在正在建设阶段。 LLO由两个108英寸直径的隧道(水腿和陆腿)组成,最终终止于一个新的阀门,该阀门将释放到下游的Schoharie Creek。两个隧道约合2,160线脚组合,设计用于使用桥接微管施工方法完成。当水腿在储存器底部的底部落在刚性池水位下方的153英尺处的接收部位时,通过湿法检索方法将完成微管钻机(MTBM)的检索。本文提出了项目的风险概况,项目交付中采用的风险管理方法。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号