Profiled High Risk - No Threat to Gilboa Low Level Outlet Microtunnel Design and Construction Project

机译:高风险简介-对Gilboa低水位出口微隧道设计和建设项目没有威胁

获取原文

摘要

Gilboa Dam, in upstate New York, impounds Schoharie Creek to form the Schoharie Reservoir. Constructed in 1929, it is the northernmost reservoir in the Catskill System of the New York City water supply system. To ensure the dam’s continued long-term performance and reliability, the New York City Department of Environmental Protection (NYCDEP) embarked on a reconstruction program to extend the dam’s service life under the current New York State Department of Environment Conservation (NYSDEC) dam safety guidelines. NYCDEP is constructing a Low-Level Outlet (LLO) to facilitate the ability to drain the reservoir to meet NYSDEC dam safety requirements and to provide an ability to make conservation releases. The project has been advanced through stages of risk evaluation from planning through engineering design and is now in the construction phase. The LLO consists of two 108-inch-diameter tunnels (a water leg and a land leg), ultimately terminating at a new valve chamber that will release water to the Schoharie Creek downstream. The two tunnels are approximately 2,160 linear feet combined, and are designed to be completed using trenchless microtunneling construction methods. When the water leg is mined into the receiving site at the bottom of the reservoir at 153 feet below normal pool water level, retrieval of the microtunnel boring machine (MTBM) will be completed via wet retrieval methods. This paper presents the project’s risk profile, and the risk management approach adopted in the delivery of the project.
机译:纽约州北部的吉尔伯亚水坝(Gilboa Dam)扣留了Schoharie Creek,形成了Schoharie水库。它建于1929年,是纽约市供水系统的卡茨基尔系统中最北端的水库。为了确保大坝的长期长期性能和可靠性,纽约市环境保护局(NYCDEP)根据现行的纽约州环境保护部(NYSDEC)大坝安全准则,着手进行了一项重建计划,以延长大坝的使用寿命。 。 NYCDEP正在建造一个低水位排水口(LLO),以提高排水能力,以满足NYSDEC大坝安全要求,并提供释放保护的能力。从计划到工程设计,该项目已进入风险评估阶段,目前处于施工阶段。 LLO由两个直径为108英寸的隧道(一个水路段和一个陆地路段)组成,最终终止于一个新的阀室,该阀室将水释放到下游的Schoharie Creek。这两个隧道的总长度约为2160线性英尺,设计为使用无沟槽微隧道施工方法完成。当将水段开采到比正常水池水位低153英尺的水库底部的接收点时,将通过湿取方法完成对微隧道钻孔机(MTBM)的取回。本文介绍了项目的风险概况以及项目交付中采用的风险管理方法。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号