首页> 外文会议>SPE Kingdom of Saudi Arabia Annual Technical Symposium and Exhibition >Saving Rig Time on Exploration and Development in Deep Gas Wells with an Innovative Approach to Test and Prepare Liners Prior to Completion Wahid Obari, Mohamed Hegazy, Hasan Ali, Mazen Markabi, Mohammed R. AlAwfi, Mohamed Khalil Nafi and Abdulqawi Al-Fakih- Schlumberger
【24h】

Saving Rig Time on Exploration and Development in Deep Gas Wells with an Innovative Approach to Test and Prepare Liners Prior to Completion Wahid Obari, Mohamed Hegazy, Hasan Ali, Mazen Markabi, Mohammed R. AlAwfi, Mohamed Khalil Nafi and Abdulqawi Al-Fakih- Schlumberger

机译:拯救钻机时间探讨深气井井中的探索和发展,以创新的方法测试和准备衬里,在完成Wahid Obari,Mohamed Hegazy,Hasan Ali,Mazen Marlabi,Mohammed R. Alawfi,Mohamed Khalil Nafi和Abdulqawi Al-Fakih-斯努姆伯格

获取原文

摘要

When deep gas drilling in the Middle East, the well completion operation is considered one of the most critical phases of the well construction process. This is due to the series of runs required in order to prepare the well for the lower and upper completions while ensuring well integrity and well barriers. The well completion preparation and complex cleaning requirements are time consuming, representing up to 16% of the total well time. This typically requires multiple clean-up runs after cementing the lower completion (production liner) and before running the upper completion. These additional trips not only consume rig time, but expose the operation to health, safety, and environment (HSE) and non-productive time (NPT) related problems. Conventional operations, in some cases, may require up to six separate trips to set completions in the well. These extra trips can be reduced by combining different technologies based on specific completion applications to execute the necessary tasks while eliminating unnecessary working time from the drilling operations and the associated cost to a well. Addressing the challenges associated with the wells in the Middle East required the development of a series of tools and procedures to optimize the operation by completing the required tasks in a single combined cleanout BHA. This paper will provide details about how the operation was successfully performed and can be recreated for other wells experiencing the same challenges. This paper includes the procedures and the description of tools used to combine multiple runs into one single clean out BHA, which saved 3 to 5 days of rig time per well. In addition, it will review the challenges faced in developing and executing this novel approach to prepare the wellbore for the upper completion and the possible total savings.
机译:当深气钻在中东时,井完成操作被认为是井施工过程中最关键的阶段之一。这是由于所需的一系列运行,以便在确保良好的完整性和良好的障碍时准备井下和上层完井。完井准备和复杂的清洁要求是耗时的,占总井时间的16%。这通常需要多次清理运行在削弱较低的完成(生产衬垫)后,并在运行上部完成之前。这些额外的旅行不仅消耗了钻机时间,而且使操作暴露于健康,安全和环境(HSE)和非生产时间(NPT)相关问题。在某些情况下,常规操作可能需要多达六个单独的行程来设置井中的完成。通过基于特定的完成应用来执行不同的技术来执行必要的任务,同时从钻井操作和井中的相关成本中消除不必要的工作时间来减少这些额外的旅行。解决与中东井相关的挑战需要开发一系列工具和程序,以通过在单一组合的清除BHA中完成所需的任务来优化操作。本文将提供有关如何成功执行操作的详细信息,并可以为遇到同样挑战的其他井来重新创建。本文包括程序和用于将多个运行组合成一个清理除了BHA的工具的程序,该工具将每孔节省3至5天的钻机时间。此外,它还将审查开发和执行这种新方法的挑战,以准备井筒的上层完成和可能的总节约。