High shared costs imposed by the mutualisation schemes implemented in France since 2012 could jeopardize the viability of some wind power plant projects. In parallel, locations of new projects are far from power substations also increasing costs for wind developers. In this context, we propose new strategies for the connection of wind power plants (WPP) into the distribution network to increase the feasibility of new projects.
展开▼