首页> 外文会议>European Wind Energy Association Annual Event >RENEWABLE ENERGY IN ARGENTINA: RenovAr Program Round 1: FIRST PUBLIC CALL FOR TENDERS FOR RENEWABLE ENERGY SUPPLY - (PPT)
【24h】

RENEWABLE ENERGY IN ARGENTINA: RenovAr Program Round 1: FIRST PUBLIC CALL FOR TENDERS FOR RENEWABLE ENERGY SUPPLY - (PPT)

机译:阿根廷可再生能源:Renovar计划第1轮:首次公开呼吁可再生能源供应招标 - (PPT)

获取原文

摘要

For each individual Technology: 1. Calculate Adjusted Offered Price (POA) using Offered Price, Loss Factors (#) and a 0.15 USS improvement for each 30 days of Offered Execution Deadline priority vs. Maximum Execution Deadline; 2. Discard those Bids whose POA is over the Maximum Award Price (*); 3. Sort Bids in ascending order by POA; 4. In the case of a tie, the selection criteria will be, in order of hierarchy, lowest POA, highest Local Component, and finally, by draw. 5. Allocation and award will occur only if: - The Offered Power Capacity or Minimal Power Capacity for partial award do not exceed the interconnection Node Capacity, the Maximum Power Capacity by Technology, nor the Total Required Capacity (1.000 MW) and; - The Bidder does not exceed its Financial Capacity. 6. For Wind energy, only up to 500 MW will be allocated on the Comahue and Patagonia corridors, except in case the remaining 100 MW quota is not allocated in the rest of the country.
机译:为每个技术提供:1。使用提供的价格,损失因素(#)和0.15美元提供的执行截止日期优先级与最高执行截止日期的30天,计算调整后的价格(POA)。 2.丢弃那些POA超过最大奖励价格(*)的投标; 3. POA按升序排序投标; 4.在领带的情况下,选择标准将按层次结构,最低POA,最高局部成分,最后,通过绘制。 5.仅当以下情况下会发生分配和奖励: - 供货的电力容量或部分奖励的最低功率容量不超过互连节点容量,通过技术的最大功率容量,也不是所需的总容量(1.000mW)和; - 投标人不超过其财务能力。 6.对于风能,只有高达500兆瓦将分配在Comahue和Patagonia走廊上,除非在该国其他地方分配剩余100兆瓦的配额。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号