首页> 外文会议>IABSE Conference on Bridges and Structures Sustainability-Seeking Intelligent Solutions >Critical Design Problems and Countermeasures for Non-channel Continuous Steel Box Girders of HongKong-Zhuhai-Macao Bridge
【24h】

Critical Design Problems and Countermeasures for Non-channel Continuous Steel Box Girders of HongKong-Zhuhai-Macao Bridge

机译:香港 - 珠澳桥非通道连铸钢箱梁的关键设计问题及对策

获取原文

摘要

The ongoing construction of Hong Kong-Zhuhai-Macao Bridge(HZMB) project adopts large cantilever flange steel box girder with orthotropic bridge deck structure, which has cross section of one single box with twin rooms. Aiming at the problems, such as welding fatigue of orthotropic bridge deck, vortex-induced vibration of box girder and buckling instability of thin-walled box girder, the key technical countermeasures took in HZMB project will be presented in this paper. Wherein, some special optimized constructional details of design are adopted to decrease the risk of welding fatigue of orthotropic bridge deck, and tune-massed dampers are used to control the vortex-induced vibration of continuous steel box girder. Regarding the buckling problem of instability of thin-walled box girder happened in the project, some countermeasures are proposed.
机译:港珠 - 澳桥(HZMB)项目的持续建设采用大型悬臂法兰钢箱梁,具有正交桥甲板结构,配有一个带双床间的单个盒子的横截面。旨在解决正交桥式甲板的焊接疲劳,涡旋诱导的箱梁振动和薄壁箱梁的屈曲不稳定性,在本文中将介绍HZMB项目的关键技术对策。其中,采用一些特殊优化的结构细节来降低正交桥甲板的焊接疲劳风险,并且使用调谐阻尼器来控制连续钢箱梁的涡旋诱导的振动。关于该项目发生的薄壁箱梁不稳定的屈曲问题,提出了一些对策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号