首页> 外文会议>SPE Kuwait Oil Gas Show and Conference >Installing Sucker Rod Pumping System on a Dual String Well Using Rig-less Intervention - Burgan Field - South East Kuwait
【24h】

Installing Sucker Rod Pumping System on a Dual String Well Using Rig-less Intervention - Burgan Field - South East Kuwait

机译:安装吸盘杆泵送系统在双弦井使用钻机干预 - Burgan Field - South East Kuait

获取原文

摘要

The vision of each company in the current oil and gas industry scenario is to utilize the existing field investment to increase oil production at minimum cost. Installing sucker rod pumping unit on a dual string well was a big challenge to achieve, especially when the other string was producing naturally. The manuscript focuses on the challenges accompanied with the identification of well needs, designing phase, planning phase and execution phase. Meetings have been held with both field development and well surveillance engineers to discuss the challenges to be faced to install a sucker rod pumping unit. The challenges were to occupy a turn in the rig schedule that have been set for the rest of the quarter, to install the surface unit in presence of a well head set on a high level to meet dual string surface set up and in downhole pump installation to be set through a 3.5- in. tubing with no rig accessThe solution was to use a unique way of installation by utilizing the available equipment without having the need of using a rig. Running downhole insert pump using a insert pump anchor was the solution to set the pump at any desired depth inside the 3.5" tubing. That will only require a flush-by unit access with no need to remove the current surface set up for the dual strings. The well head for the desired well was set to 11.5 ft above ground level creating a big challenge that has been solved by using 6 portable gravel pans that can be re-located later to lift the surface unit with 6 ft to be installed above the desired string. Successfully installing the sucker rod pumping unit in such way resulted the following benefits: a. Achieve required oil recovery from the string without affecting the other naturally flowing one. b. Eliminated work over Operation and stand by time costs. c. Reduced No-Production period. d. Installed downhole pump with the capability of retrieving the pump and/or converting the artificial lift method if required with no rig intervention. Successful installation of a sucker rod system on a dual string well for the first time in Kuwait in Burgan field, is now considered a solution for dual string wells to optimize oil recovery with minimum cost, and is being considered as a reference for rig-less interventions with the capability of changing the type of lift in future.
机译:目前石油和天然气行业情景中每家公司的愿景是利用现有的现场投资,以最低成本提高石油产量。在双弦井上安装吸盘杆泵送单元是一个很大的挑战,尤其是当另一个字符串自然产生时。手稿专注于伴随着识别井需求,设计阶段,规划阶段和执行阶段的挑战。举办了会议,并举行了现场开发和良好的监控工程师,讨论安装吸盘泵送装置的挑战。挑战是占据本季度其余部分所设定的装备时间表,以便在高水平上设定的井头安装表面单元以满足双弦表面设置和井下泵安装通过3.5英寸设置。没有钻机的管道解决方案是通过利用可用的设备使用独特的安装方式,而无需使用钻机。使用插入泵锚运行井下插入泵是将泵在3.5“管内的任何所需深度处设置泵。这将仅需要刷新单元,无需去除用于双弦的电流表面设置。所需井的井头设定为上方11.5英尺,创造了通过使用6个便携式砾石平底锅可以重新定位的6英尺抬起6英尺以安装在上方的面部挑战的大挑战。所需的绳子。以这种方式成功安装了吸盘杆泵送单元,导致了以下优点:a。从串中获得所需的溢油而不影响另一个自然流动的油。湾通过时间成本消除了工作和支架。C.减少没有生产期。天。如果需要没有钻机干预,可以使用泵和/或转换人工升降方法的能力安装了井下泵。成功地安装了吸盘杆系统在Burgan领域的科威特第一次第一次进行双弦,现在被认为是双弦井的解决方案,以优化最低成本的石油回收,并且被认为是钻机干预的参考,具有改变类型的能力未来推动。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号