首页> 外文会议>World Tunnel Congress >Challenges in the Design of Segmentally Lined Tunnels for Combined Sewer Outfalls
【24h】

Challenges in the Design of Segmentally Lined Tunnels for Combined Sewer Outfalls

机译:用于组合下水道出口的细分衬砌隧道设计中的挑战

获取原文

摘要

The adoption of tunneled combined sewerage interceptors and outfalls leads to design linings which are often subject to internal pressures that are larger than the external pressures, resulting in significant tension loads. The need to meet stringent durability conditions for the normal design life of 100 years often drives client specifications to require a double pass solution with a cast in situ secondary concrete lining.However, improvements in concrete technology and the need to seek efficiency in terms of time and costs, have driven designers to consider single pass segmental linings. The Riachuelo Sanitation project in Buenos Aires is subject to these constraints both upstream and downstream of a sewage treatment plant. This paper describes how the challenges of up to 2 bar pressure differential have been addressed by careful analysis of soil structure interaction to ensure that the full benefit of external ground pressure is realized, resulting in a more optimal design for the constructor both in terms of cost and time.
机译:采用隧道组合的污水处理拦截器和排水口导致设计衬里,这些衬里通常受到大于外部压力的内部压力,导致显着的张力载荷。需要满足100年的正常设计寿命的严格耐久性条件,通常会推动客户规范,以便使用双通液,以浇铸的原位次要混凝土衬里。然而,具体技术的改进以及在时间方面寻求效率的需要和成本,有驱动的设计师考虑单次通过分段衬里。布宜诺斯艾利斯的Riadchuelo卫生项目受到污水处理厂上游和下游的这些约束。本文介绍了通过仔细分析土壤结构相互作用,以确保实现外部地压的充分利益,因此解决了多达2巴压差的挑战是如何解决的,从而在成本方面为构造函数提供更优化的设计和时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号