首页> 外文会议>World Tunnel Congress >'They Want to Dig a 100-Foot Hole in Front of My House for Two Years!'
【24h】

'They Want to Dig a 100-Foot Hole in Front of My House for Two Years!'

机译:“他们想在我家门前挖一个100英尺的洞两年!”

获取原文

摘要

The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District's receiving waterbodies and mitigate chronic sewer flooding in District neighborhoods. The First Street Tunnel project is a major component of the DC Clean Rivers Project, designed to mitigate sewer flooding and basement backups in the District's historic and densely populated Bloomingdale neighborhood. Bloomingdale has been historically affected by sewer flooding and was severely impacted by four storms in the summer of 2012 that caused significant damage to homes, the environment and public property. As a result, DC Water accelerated the design and construction of the First Street Tunnel in order to mitigate the effect storms have on the undersized sewers serving the neighborhood. The infrastructure designed to mitigate flooding, including the tunnel, are located within the highly urbanized neighborhood - with some structures being less than ten feet from residents front door steps. The success of a large public works project of this magnitude and in this unique location depends on a well informed and supportive public. With the local community impacted by flooding but concerned about heavy construction impacts, this paper details the components of a successful public outreach plan and lessons learned throughout the design and construction process. Early identification of community mitigation, working cooperatively with stakeholders and frequent dissemination of accurate information required the project team to establish a culture of problem solving collaboration with the community.
机译:哥伦比亚水和下水道管理局(DC水)正在实施其26亿美元的DC清洁河流项目,以减少到地区的接受水平台的合并下水道,缓解区邻居的慢性下水道洪水。第一街隧道项目是DC Clean Rivers项目的主要组成部分,旨在减轻地区历史和密集的盛开邻居的下水道洪水和地下室备份。 Bloomingdale一直受到下水道洪水影响的历史影响,2012年夏天受到四种风暴的严重影响,对房屋,环境和公共财产造成了重大损害。结果,直流水加速了第一街隧道的设计和结构,以减轻效果风暴对邻域的口径下水道。旨在减轻洪水的基础设施,包括隧道,位于高城市化的社区内 - 一些结构距离居民前门步部不到十英尺。这个规模和在这个独特的位置的大型公共工程项目的成功取决于知情和支持的公众。随着当地社区受到洪水影响,但关注沉重的建设影响,本文详述了在整个设计和施工过程中获得的成功公开外展计划和经验教训的组成部分。社区缓解的早期确定,与利益相关者合作,并经常传播准确信息,要求项目团队建立解决与社区合作的问题文化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号