首页> 外文会议>World Tunnel Congress >Assessment of EPB Soil Conditioning on Two TBMs by Using Apparent Density
【24h】

Assessment of EPB Soil Conditioning on Two TBMs by Using Apparent Density

机译:用表观密度评估两次TBMS对两次TBM的分析

获取原文

摘要

A study was conducted on the N125 project in Seattle to investigate the use of apparent density as an assessment tool for the effectiveness of soil conditioning. The formation of an air bubble as well as the plugging of cutterhead and excavation chamber can be a result of improper soil conditioning. Both air bubble formation at the top of the excavation chamber and developing plugging issues can be identified by analyzing the apparent densities in the excavation chamber. In this study, apparent densities less than unity were observed in the upper portion of both northbound and southbound TBMs, suggesting the presence of an air bubble. Apparent densities greater than the in-situ soil density were observed in the lower portion of the excavation chamber. Particularly high values of apparent density were coincident with clogging observed at multiple locations along the alignment. The combination of less than unity upper chamber apparent density and very high apparent density in the lower portion of the chamber are related, and indicate the inability of the TBM to effectively condition and mix the soil in the chamber.
机译:在西雅图的N125项目进行了一项研究,以研究表观密度作为土壤调理有效性的评估工具。空气气泡的形成以及切割器头和挖掘室的堵塞可能是土壤调节不当的结果。通过分析挖掘室中的表观密度,可以通过分析挖掘室中的表观密度来识别出挖掘室顶部的气泡形成和开发堵塞问题。在这项研究中,在北行和南行TBMS的上部观察到比统一的表观密度,表明存在气泡。在挖掘室的下部观察到比原位土壤密度大的表观密度。特别是表观密度的特别高,在沿着对准的多个位置观察到堵塞。腔室下部的小于统一上室表观密度和非常高的表观密度的组合有关,并指示TBM的无能为力地应变并将土壤混合在腔室中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号