首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >Mitigation Procedures and Best Practices to Conduct Slickline Memory Mode Production Logging In High-Pressure High-Temperature Sour Gas Wells
【24h】

Mitigation Procedures and Best Practices to Conduct Slickline Memory Mode Production Logging In High-Pressure High-Temperature Sour Gas Wells

机译:在高压高温酸性气井中进行钢丝绳记忆模式生产测井的缓解程序和最佳实践

获取原文

摘要

Objectives/Scope:This paper summarizes mitigation practices to safely conduct slick line memory production logging(PLT)in high pressure sour gas wells.The paper addresses the enhancements that were made to overcome the lifting force on the tool due to high flow rates and prolonged exposure time.Methods,Procedures,Process:Well intervention in a live well poses several safety and operational considerations.These considerations are more critical when operating at or near high-pressure,hightemperature(HPHT)conditions in sour gas reservoirs.Well intervention in these types of reservoirs is associated with specific risks and,consequently,require a modified tool string designed specifically to withstand such a demanding environment.The paper describes all the problems that can occur in performing such jobs,and their mitigation practices that will lead to a successful job.Results,Observations,Conclusions:There are several conveyance methods to run PLT in gas wells,such as:slickline,wireline,and coil tubing.In this job,the wireline could not be utilized due to its material which is not compatible with sour gas.Coil tubing is generally run in horizontal wells,but for a vertical well,CT is not a cost-effective option.Hence,slickline in memory mode was chosen.The slickline material is of utmost importance,and must be verified to withstand sour environment.Moreover,the pressure control equipment(PCE),H2S partial pressure,job safety analysis(JSA),job schedule,and job time,are all important factors that were carefully analyzed to successfully perform this job.Novel/Additive Information:This paper might be the first in the literature describing how to safely perform slick line memory mode PLT in high-pressure high temperature sour gas environment.
机译:目标/范围:本文总结了在高压含硫气井中安全进行钢丝绳记忆生产测井(PLT)的缓解措施。本文介绍了为克服因高流速和长时间暴露在工具上而产生的提升力而进行的增强。方法、程序和过程:在活井中进行井内干预会带来一些安全和操作方面的考虑。在酸性气藏的高压高温(HPHT)条件下或接近高压高温(HPHT)条件下运行时,这些考虑因素更为关键。这些类型储层中的油井干预与特定风险有关,因此,需要专门设计的改进工具管柱,以承受如此苛刻的环境。本文描述了在执行此类工作时可能出现的所有问题,以及将导致工作成功的缓解措施。结果、观察结果、结论:在气井中运行PLT有几种输送方法,例如:钢丝绳、钢丝绳和挠性管。在这项工作中,由于其材料与酸性气体不相容,无法使用钢丝绳。挠性管通常在水平井中运行,但对于直井,CT并不是一种经济有效的选择。因此,选择了记忆模式中的钢丝绳。钢丝绳材料至关重要,必须经过验证,以承受酸性环境。此外,压力控制设备(PCE)、H2S分压、工作安全分析(JSA)、工作计划和工作时间都是为成功完成这项工作而仔细分析的重要因素。新颖/附加信息:本文可能是文献中第一篇描述如何在高压高温酸性气体环境中安全执行流线存储模式PLT的文章。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号