Integrated Forecasting and Scheduling Creates Organizational Stability and Predictability

机译:集成预测和调度创造了组织稳定性和可预测性

获取原文

摘要

Forecast and scheduling were integrated to reduce monthly financial forecast iterations,provide consistent scheduling across platforms,and enhance effective communication throughout the organization.The purpose of this process improvement initiative was to create transparency and confidence in the processes used across the organization to create the yearly budget and manage operations using it throughout the year,providing efficiencies throughout the company.Tools and processes were built to leverage best practices and create synergies that could enhance data analytics in the future.Four initiatives(Budget and Forecasting,Management Systems,Organizational Effectiveness,and Scheduling)were set up to improve the various process components that needed strengthening in the organization.An organizational structure was formed consisting of a Project Manager,Champion,Steering Team,Workstream Lead(s),and Workstream Core Team.Workshops were held biweekly with the core team to build the as-is and future state processes,while leveraging internal and external best practices.Every eight weeks the team met with the Steering Team to provide an update and solicit feedback on the team's direction.Training and sustainability frameworks were also developed and integrated into the organization.The Integrated Forecasting and Scheduling project created synergies and efficiencies throughout the organization by reducing the length of meetings,eliminating manual reports,and creating a consistent approach to how work was planned offshore.Approximately 500-600 workhours per month were saved through this effort,providing more time for technical personnel to focus on value-added work.A framework was developed that included timelines and guidelines for budget submissions along with quarterly forecasts.Additionally,a standardized approach for how activities were added to the asset schedules was adopted,encouraging planning based on various project milestones.Structure around managing business changes was incorporated to enhance cross-discipline communication and capture impacts for all stakeholders,including drilling rig schedule changes,which caused impacts across the organization.For enhanced reporting,a management reporting tool was built utilizing Spotfire as the front-end user interface and leveraging corporate database systems as the back-end data sources.Consolidating weekly report information using SharePoint provided management with a single source to review information across several aspects of the business(HSE,regulatory,drilling updates,asset updates,cost analysis,downtime,production,etc.)This paper will demonstrate the positive enhancements realized through a paradigm shift in business unit culture,which resulted in a more proactive corporate environment.The resulting benefits of the Integrated Forecasting and Scheduling project are twofold:1)teams and individual contributors are equipped with processes and tools to conduct proper upfront planning,reducing rework and last-minute submittals or approvals;and 2)upper management is properly equipped to make informed,timely decisions via ease of access to the information within the organization.Sustainability of these process improvements is ensured through a structured,management-backed program.
机译:预测和调度已集成以减少每月财务预测迭代,在平台上提供一致的调度,并加强整个组织的有效沟通。本过程改进倡议的目的是为整个组织的流程创造透明度和信心,以创建每年的流程预算和管理在全年中使用它的运营,在整个公司提供效率。建立了效率,以利用最佳实践,并创建能够在未来提升数据分析的协同作用.Four计划(预算和预测,管理系统,组织效率,组织效率,设立和调度),以改善组织所需的各种过程组件。组织结构是由项目经理,冠军,转向团队,工作流铅和工作流核心团队组成的组织结构.Workshops是双周举行的与核心团队建立原样D未来的状态流程,同时利用内部和外部最佳实践。每八周都遇到了队员与指导团队会面,以提供对团队方向的更新和征求反馈.TROUNTINATION和可持续性框架也被开发并融入组织中。综合预测和调度项目通过减少会议的长度,消除手动报告,并创造一个持续的措施来培养何种努力的措施来创造了整个组织的协同和效率。通过这项努力,提供了每月500-600个工作冲程,提供更多时间对于专注于增值工作的技术人员来说,制定了框架,其中包括预算提交的时间和准则以及季度预测。加盟,采用了如何向资产时间表中添加活动的标准化方法,基于各种令人鼓舞的规划项目里程碑。管理业务杂志的结构Nges被注册,以提高跨学科沟通和所有利益相关者的影响,包括钻井平台时间表的变化,这导致了整个组织的影响。对于增强的报告,将管理报告工具利用Spotfire作为前端用户界面建立并利用公司数据库系统作为后端数据源。使用SharePoint提供每周报告信息,提供管理的管理,以便在业务的若干方面审查信息(HSE,法规,钻探更新,资产更新,成本分析,停机时间,生产,本文将展示通过商业部门文化的范式转变实现的积极增强,从而实现了更积极主动的企业环境。综合预测和调度项目的效益是双重的:1)队伍和个别贡献者配备了使用流程和工具进行适当的前期规划,减少返工和最后一分钟的提交或批准;和2)上层管理层通过易于获取组织内的信息,妥善管理层能够妥善了解,并通过易于获取组织内的信息。通过结构化的管理支持的计划确保了这些过程改进的夸张性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号