The Fully Retrievable ESP System Cable Deployed (CD) is a new technology which permits the rigless deployment of ultra slim OD Electrical Submersible Pump, able to reduce production loss while waiting for work over: these operations should be performed by a proprietary power and load carrying cable, and should be through tubing with the possibility to retrofit an existing completion. Based on previous Eni Partially Retrievable Experience, a R&D tender was launched among all ESP contractors interested to identify a complete rigless ESP solution. All technologies proposed were evaluated and Novomet was awarded the contract for the trial installation. Eni philosophy was to select the best candidate well which can be representative of the main criticalities of all Eni asset, in order to export the technology in the majority of operated fields. The scouting was performed among all Eni Geographical Business Units (GBU) and finally a well in Italy was selected to be the best candidate. The aim of the test was to install and operate the ESP for a short period of time, in order to validate the technology and diffuse it among the other GBU interested. It is important to highlight that the well selected is equipped with a Shallow Set Safety Valve, as common practices for ESP installation, so the R&D test will investigate also the functionality of the insert safety valve. The paper will describe all the steps needed to go further in a Rigless ESP installation project and all the lesson learnt that Eni can draw for the Oil & Gas Industry. The selected solution allows the retrofit option for the current shut-in wells, thus increasing the business opportunity for this type of technology. It is evident that each ESP solution (standard, partially or fully rigless) has pros & cons that will be discussed in the paper to guide the operator in the selection of the best possible option.
展开▼