首页> 外文会议>Abu Dhabi International Petroleum Exhibition Conference >Cable Deployed ESP-Solution to Decrease OPEX Reducing Workover Needs and Retrofitting Existing Completion
【24h】

Cable Deployed ESP-Solution to Decrease OPEX Reducing Workover Needs and Retrofitting Existing Completion

机译:电缆部署ESP-解决方案以减少OPEX降低工作组需求并改造现有完成

获取原文

摘要

The Fully Retrievable ESP System Cable Deployed (CD) is a new technology which permits the rigless deployment of ultra slim OD Electrical Submersible Pump, able to reduce production loss while waiting for work over: these operations should be performed by a proprietary power and load carrying cable, and should be through tubing with the possibility to retrofit an existing completion. Based on previous Eni Partially Retrievable Experience, a R&D tender was launched among all ESP contractors interested to identify a complete rigless ESP solution. All technologies proposed were evaluated and Novomet was awarded the contract for the trial installation. Eni philosophy was to select the best candidate well which can be representative of the main criticalities of all Eni asset, in order to export the technology in the majority of operated fields. The scouting was performed among all Eni Geographical Business Units (GBU) and finally a well in Italy was selected to be the best candidate. The aim of the test was to install and operate the ESP for a short period of time, in order to validate the technology and diffuse it among the other GBU interested. It is important to highlight that the well selected is equipped with a Shallow Set Safety Valve, as common practices for ESP installation, so the R&D test will investigate also the functionality of the insert safety valve. The paper will describe all the steps needed to go further in a Rigless ESP installation project and all the lesson learnt that Eni can draw for the Oil & Gas Industry. The selected solution allows the retrofit option for the current shut-in wells, thus increasing the business opportunity for this type of technology. It is evident that each ESP solution (standard, partially or fully rigless) has pros & cons that will be discussed in the paper to guide the operator in the selection of the best possible option.
机译:部署的全新技术(CD)是一种新技术,允许超薄OD电气潜水泵的严格部署,能够在等待工作的同时降低生产损失:应通过专有电源和负载携带进行这些操作电缆,应该通过管道,可以改进现有的完成。基于以前的ENI部分可获得的经验,在所有旨在识别完整的Rigless ESP解决方案的所有ESP承包商中都会推出研发投标。拟议的所有技术均评估,诺瓦斯被授予试验安装合同。 eni哲学是为了选择最佳候选者,这些候选人可以代表所有ENI资产的主要关键性,以便在大多数经营领域出口技术。在所有eni地理商业单位(GBU)之间进行了侦察兵,最后选择了良好的候选人是最好的候选人。测试的目的是在短时间内安装和操作ESP,以便验证技术并在其他兴趣的其他GBU中扩散它。重要的是要强调,所选择的良好设施配备浅设定的安全阀,作为ESP安装的常见实践,因此R&D测试也将研究插入安全阀的功能。本文将描述在严格的ESP安装项目中进一步进一步进一步所需的步骤,并了解ENI可以吸引石油和天然气行业。所选解决方案允许对当前关闭井的改装选择,从而增加这种技术的商机。很明显,每个ESP解决方案(标准,部分或完全严格)具有将在本文中讨论的优点和缺点,以指导操作员在选择最佳选择中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号