Best Operational Practices to Optimize the Time Cost for Drilling in Appraisal Unconventional HP/HT Wells Across Deyab Formation, Abu Dhabi-UAE

机译:最佳的运营实践,以优化钻探钻探钻井的时间和成本,横跨Deyab形成,Abu Dhabi-UAE

获取原文

摘要

This paper has the recommended procedures to be carried out in each phase: Surface, Intermediate I and II, horizontal and completion with frac string, for Unconventional Appraisal HP/HT wells across Deyab formations in Abu Dhabi (UAE), as well as the technology to be used and avoid, to drill the wells saving time and money helping to make a rentable project. Due to the information received of the zone was scarce, in addition the first well in the area (offset well and taken as a reference) had many operational problems. The operations during drilling the next three wells in PAD # 1 were recorded, analyzed and optimized, resulting in a learning catalog for the area, saving a considered quantity of rig days with a huge impact in the budget and the most important, the exposure of the crews/people at the location was minimized to this hazard environment. The PAD# 1 has 03 horizontal wells, the design is Heavy Casing Design, where each phase has its characteristics to be drilled and cased. The reservoir consists of 03 cl early identified formations: Jubaila, Hanifa and Tuwaiq Mountain into the range from ± 12330 ft. TVD to ± 12900 ft. TVD. Reaching the targets with horizontal wells from 16,000 ft. MD to 17,500 ft. MD. After analyzing each section and getting the recommendations from different service companies and specialist, the changes were implemented in the next well regarding drilling fluid MW, BHA's design, bit type & design, wiper trips, slurries, trajectories, etc. taking as result drilling wells more complicate d without operational issues, in deepest formation, drilling more than 1000 ft. MD and 600 ft. TVD, and saving 3.25 MMS and 15.2 days per well The PAD # 1 in Deyab field, is the pioneer for the initial development of fracking in UAE. There hasn't had a drilling procedure in detail to reach the target without having issues. This new concession has been already of interest to be developed in conjunction with the National Company, so create a Drilling Learning Catalogue as add value at the moment to handover the wells is a must.
机译:本文的推荐程序是在每个阶段进行的推荐程序:表面,中间体I和II,水平和完成FRAC字符串,在Abu Dhabi(阿联酋)和技术中,在Deyab型形成的非传统评估HP / HT孔要使用并避免,钻取井中节省时间和金钱,帮助制作租赁项目。由于收到区域的信息稀缺,另外该地区的第一井(偏移良好并作为参考)有许多操作问题。记录,分析和优化在垫#1中钻出接下来的三个井的操作,导致该地区的学习目录,节省了一定数量的钻机日,在预算中具有巨大影响和最重要的曝光该地点的人员/人们最小化到这种危险环境。垫#1具有03水平孔,设计是厚重的套管设计,其中每个相位有其特性钻孔和套管。水库由03 CL早期确定的地层组成:朱瓦拉,哈尼法达和Tuwaiq山脉到±12330英尺的范围内.VD到±12900英尺.VD。从16,000英尺的水平井到达目标。MD至17,500英尺。MD。在分析每个部分并从不同的服务公司和专家获取建议后,在下一个关于钻井液MW,BHA的设计,位类型和设计,刮水器,浆料,轨迹等中的更加良好的变化。随着钻井井,散步更复杂的d没有操作问题,在最深层的地层中,钻取超过1000英尺。MD和600英尺。电视,并在Deyab领域的垫#1节省3.25毫米和15.2天,是初始开发的爆破在阿拉伯联合酋长国。没有有问题,还没有详细钻探过程以达到目标。这种新的特许权已经有兴趣与国家公司一起发展,因此创建钻探学习目录,因为目前增加价值,以切换井是必须的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号