Automated MPD Control System Helps Navigate Through Drilling Problems, Meets Objectives in Shakal Block, North Iraq

机译:自动MPD控制系统有助于浏览钻孔问题,符合Shakal Block的目标,北伊拉克

获取原文

摘要

This following case study details the methodology followed and challenges encountered while drilling in the Shakal Block of North Iraq. A narrow drilling window and geologically-associated problems in the first well, Shakal-1, were enough to demonstrate that non-conventional drilling techniques are needed to develop Shakal field potential. In case of Shakal-2 and Shakal-3 exploration wells, the 12-1/4" and 8-1/2" hole sections applied Managed Pressure Drilling (MPD) technique and Microflux~R control system technology to reach planned objectives and reduced a combined 15 days of drilling time, equating to associated cost savings of US$1.8MM. The primary objective of drilling with these techniques in the Shakal field was to maintain the Equivalent Circulating Density (ECD) within the operative window and keep the downhole circulating pressure close to formation pore pressure in order to minimize nonproductive time, optimize drilling performance and minimize formation impairment. In addition to the drilling objectives, MPD help was needed in order to safely facilitate trips to surface derived from normal scheduled operations as well as unprogrammed operations caused by tool failures or drilling problems; in some fields like Shakal, pulling out of hole can be equal or more difficult than the actual drilling operation. All planned operating windows have some degree of uncertainty. In the cases of Shakal-2 and Shakal-3, Microflux control system technology detected early signs of influx and fluid loss when there was a deviation from the anticipated drilling window. The flexibility of MPD technique during trips with Stripping Method showed high benefits on these holes sections along with accurate monitoring of well parameters for early detection of influx and losses. The use of MPD contributed to significant time, cost savings and safety increment for the Shakal-2 and Shakal-3 in the 12-1/4" & 8-1/2" hole sections.
机译:如下,如下案例研究详细介绍了在北伊拉克南际钻井区内遇到的方法论和挑战。第一孔狭窄的钻孔窗口和地质相关问题,Shakal-1足以证明需要非传统的钻井技术来开发振荡场势。在Shakal-2和Shakal-3勘探井的情况下,12-1 / 4“和8-1 / 2”孔部分施加了施用的压力钻孔(MPD)技术和Microflux〜R控制系统技术,达到了计划的目标和减少钻井时间的15天,等同于相关成本,节省1.8毫米。在Shakal领域中钻探这些技术的主要目标是在操作窗口内保持等效的循环密度(ECD),并使井下循环压力保持接近地层孔隙压力,以便最小化非培养时间,优化钻井性能并最小化形成损伤。除了钻井目标外,需要MPD帮助,以便安全地促进到从正常预定运营的表面进行途径以及由工具故障或钻井问题引起的未编程操作;在一些像Shakal这样的领域,从实际钻孔操作中拉出孔可以相等或更困难。所有计划的操作窗户都有一定程度的不确定性。在Shakal-2和Shakal-3的情况下,微型丝网控制系统技术检测到从预期钻孔窗口偏离时的涌入和流体损失的早期迹象。在带剥离方法的跳闸过程中MPD技术的灵活性在这些孔部分上显示出高益处,以及对井参数的准确监测,用于早期检测流入和损失。使用MPD的促成显著时间,节约成本和安全增量为胡狼-2和胡狼-3中的12-1 / 4" &8-1 / 2" 孔部。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号