In this article used loading tests for large diameter and deep drilling piles in Astana, Kazakhstan. Diameter bored piles which have diameter more than 820mm and 13.5 m depth have been executed at the construction site of New Monument in Astana. Also are considered some of the requirements of the designer of piled foundations and to what extent the accessible testing methods comply with these requirements. Finally, are introduced some recommendations are made for testing methods suitable for problematical ground conditions of Kazakhstan. Traditionally, pile load tests in Kazakhstan are carried out using static and dynamic load test methods. Static pile load test is the most reliable method to obtain the load-settlement relation of piles. Most of the static pile load tests are performed using reaction systems. Furthermore, cost and time for the static pile load test are relatively high compared to the dynamic pile load testing. Therefore, the number of pile load tests in construction site is limited to 2 or 5 piles in usual of constructed piles in Kazakhstan.
机译:在本文中,使用哈萨克斯坦阿斯塔纳的大直径和深钻桩的装载试验。在阿斯塔纳的新纪念碑的施工现场执行了直径超过820mm和13.5米深度的直径钻孔。也被认为是堆积的基础设计者的一些要求以及可访问的测试方法符合这些要求的程度。最后,介绍了一些建议,用于测试方法,适用于哈萨克斯坦的问题地面条件。传统上,使用静态和动态载荷测试方法进行哈萨克斯坦的桩载试验。静态桩载荷测试是获得桩载荷关系的最可靠的方法。大多数静态桩载荷测试使用反应系统进行。此外,与动态桩负载测试相比,静态桩负载试验的成本和时间相对较高。因此,施工现场的桩载试验数量仅限于哈萨克斯坦的建造桩的2或5桩。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号