首页> 外文会议>Asian-Pacific symposium on structural reliability and its applications >Study on Approprate Parameters of Grouting Circle for TBM Tunnel under High Water Pressure in Water-Enhanced Region
【24h】

Study on Approprate Parameters of Grouting Circle for TBM Tunnel under High Water Pressure in Water-Enhanced Region

机译:水增强区高水压下TBM隧道灌浆圈拨动参数的研究

获取原文

摘要

Water load on lining and limiting discharge are two key issues affecting the structure safety and rationality in the process of designing a tunnel in high water pressure and water-enriched region.In this paper,with the principle of blocking groundwater and limiting discharge, the impacts of grouting circle's thickness and seepage coefficient on external water pressure of lining and discharge are studied.Based on the case of the IBM tunnel in Shanxi Yellow River Diversion Project China, which is located at high water pressure and water-enriched karst region, the appropriate parameters of grouting circle are put forward by the comparison between theoretical calculation and numerical simulation.
机译:衬里和限制性排出的水负荷是影响在高水压和富含水处理区域的隧道设计过程中的结构安全性和合理性的两个关键问题。在本文中,堵塞地下水和限制放电原理,影响研究了衬里衬里和排放外部水压的灌浆厚度和渗流系数。基于山西黄河转移工程的IBM隧道的情况,位于高水压和富含水中的岩溶地区,适当通过理论计算与数值模拟的比较提出了灌浆圆的参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号