Research on Synchronous Construction Control Technology for the Pylon and Girder of Maling River Cable-stayed Bridge

机译:麦芽河斜拉桥塔和梁同步施工控制技术研究

获取原文

摘要

Pier No. 8 of Maling River Bridge was constructed by synchronous construction method of pylon and girder, while pier No. 9 was constructed by conventional construction method. In this paper, synchronous construction feasibility is analyzed theoretically by construction simulation computation based on the Maling River Bridge, and its construction control technology is stated.
机译:Maling River桥8号码由塔和梁的同步施工方法构建,而码头9是通过常规施工方法构建的。本文通过基于麦芽河桥的施工模拟计算理论上分析了同步施工可行性,并说明了其施工控制技术。