首页> 外文会议>International Conference on Electronics, Network and Computer Engineering >Research on Task Planning Problem of Satellite-Ground Time Synchronization
【24h】

Research on Task Planning Problem of Satellite-Ground Time Synchronization

机译:卫星接地时间同步任务规划问题研究

获取原文

摘要

The task planning of satellite-ground time synchronization (SGTSTP) is a complex multi-objective ground station scheduling problem. In this paper, we establish the problem formulation and analyze the optimization objectives. Based on the complexity analysis, we design a solving framework based on decomposition, which divides the plan horizon into many un-interactional plan periods and execute task planning in each period. In algorithm selection, the MOGA and NSGA2 are selected. At last, two different scale scenarios are designed and the computational result shows that more periods can get better result but spend more time, besides, the MOGA has better performance in efficiency and effect than NSGA2, however NSGA2 can get more solutions in solving SGTSTP.
机译:卫星接地时间同步(SGTSTP)的任务规划是复杂的多目标地面站调度问题。在本文中,我们建立了问题制定并分析了优化目标。基于复杂性分析,我们设计了基于分解的解决框架,该框架将平面视界划分为许多未分离的计划期并在每个时期执行任务规划。在算法选择中,选择MOGA和NSGA2。最后,设计了两种不同的尺度方案,计算结果显示更多的时期可以获得更好的结果,但花费更多时间,此外,MOGA具有比NSGA2更好的性能和效果,但NSGA2可以在解决SGTSTP中获得更多解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号