首页> 外文会议>International Symposium on Energy Science and Chemical Engineering >The Safe Thickness of Top Plate in the Process of the Underground Excavation Transferred to Opencast Excavation
【24h】

The Safe Thickness of Top Plate in the Process of the Underground Excavation Transferred to Opencast Excavation

机译:顶板的安全厚度在地下挖掘过程中转移到Opencast挖掘

获取原文

摘要

Zijinshan gold mine once to mining local underground copper resources, result in the mined-out area which elevation from 460 m to 570 m, the upper pit continue mining down the deep, one of the main problems in the safety production is that the large-scale mining equipment work whether fall into the mined-out area, it need to determine the problems of safe thickness of roof and reasonable value; First use six theoretical analysis methods, respectively was studied and calculating the safety thickness, then using finite difference software FLAC 3D are simulated on a 1-1 section, by comparing and comprehensive research, found that using numerical simulation method to get the calculation result is far above the theoretical calculation results. In the final analysis, determine the safe thickness of roof, which provide the decision basis for safety production.
机译:Zijinshan Gold Mine曾经挖掘本地地下铜资源,导致挖掘区域抬高从460米到570米,上部坑继续挖掘深,安全生产中的主要问题之一是大 - 规模采矿设备是否落入挖出区域,需要确定屋顶安全厚度和合理价值的问题;首先使用六种理论分析方法,分别研究和计算安全厚度,然后使用有限差异软件FLAC 3D在1-1段模拟,通过比较和综合研究,发现使用数值模拟方法来获得计算结果远高于理论计算结果。在最终分析中,确定屋顶的安全厚度,为安全生产提供决策依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号