首页> 外文会议>International Forum on Applied Energy and Environment >Research on upper limit increased of mining in coal mining face
【24h】

Research on upper limit increased of mining in coal mining face

机译:煤矿煤矿矿井上限增加的研究

获取原文

摘要

In order to guarantee the safety of the coal mine, needing to leave in reasonable waterproof safety coal pillar. Aiming at the working face 3311 of Xuchang coal mine, this article based on the analysis to the basis of factors for improving the mining limit, using UDEC numerical simulation, the regulations of coal mining under buildings, railways and water bodies and historical experience to analyze crack-production ratio of the working face, study the height of water flowing fractured zone development, designing test mining program. Through the upper mining limit to liberate 160000t coal resources and to gain the obvious economic benefits, which provide important significance for other similar coal mines in coal field of North China area.
机译:为了保证煤矿的安全,需要在合理的防水安全煤柱中留下。旨在瞄准徐昌煤矿的工作面3311,本文基于分析对改善采矿极限的因素的基础,采用UDEC数值模拟,建筑物,铁路和水体下的煤矿规律及历史经验分析工作面的裂缝制作比,研究水流骨折区域开发的高度,设计测试采矿计划。通过上矿业限制来解放160000T煤炭资源,以获得明显的经济效益,为华北地区煤炭领域的其他类似煤矿提供了重要意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号