Identifying issues of change leading to cost conflicts: case study in Cambodia

机译:确定导致成本冲突的变化问题:柬埔寨的案例研究

获取原文

摘要

It is impossible to avoid changes in construction projects. Construction changes have minor and major effects on the success of a project, particularly on its cost. A detailed study of change is needed to alleviate such effects on project cost. This paper introduces the identification of specific change issues regarding costs that may lead to conflicts between the owner and the contractor of a project. Such identification would help project practitioners be aware of change issues and manage them effectively as well as open up alternative viewpoints of change by the two parties. To achieve the research objective, a 16-item questionnaire with a five-point Likert scale was conducted to collect the necessary information. The data were collected from respondents in Cambodian building construction projects. Responses from 53 professionals working for contractors and owners were analysed with the aid of software package, Statistical Package for Social Science (SPSS). The result of tests passed internal reliability of the scale and significant agreement among the respondents. The analysis of a one sample t-test showed that there were fifteen significant and important change issues. The five top priority change issues related to project costs are changes in scheduling made by the owner, project scope change made by the owner, change due to poor and incomplete design, change in design functions required by owner/client, and change in material specifications. The research findings would be beneficial to all project participants for gaining a deeper understanding of specific change issues so that change management can be carried out more efficiently. In addition, project stakeholders would be more perceptive about the consequences of any changes.
机译:无法避免建筑项目的变化。施工变动对项目的成功,特别是其成本对其成本进行了次要和重大影响。需要详细研究改变,以减轻对项目成本的影响。本文介绍了关于可能导致项目业主与项目承包商之间发生冲突的具体变更问题的识别。此类识别将有助于项目从业者意识到改变问题并有效地管理它们,以及开放双方变革的替代观点。为实现研究目标,进行了一个具有五点李克特规模的16件商品问卷,以收集必要的信息。这些数据是从柬埔寨建筑施工项目的受访者收集的。借助软件包,社会科学统计包(SPSS)的援助分析了为承包商和业主工作的53名专业人员的回应。测试结果通过了符号的内部可靠性和受访者之间的重大协议。对一个样品T检验的分析表明,有十五个显着和重要的变化问题。与项目成本相关的五个最优先变更问题是业主调度的变化,业主的项目范围变更,由于穷人和不完整的设计而变化,所有者/客户所需的设计功能以及材料规格的变化。研究结果将对所有项目参与者获得更深入了解特定变革问题的项目,以便更有效地进行变更管理。此外,项目利益攸关方将更加感知任何变化的后果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号