首页> 外文会议>IABSE Conference on Structural Engineering >Integration of cross asset risk assessment into road infrastructure asset management
【24h】

Integration of cross asset risk assessment into road infrastructure asset management

机译:交叉资产风险评估将交叉资产风险评估纳入道路基础设施资产管理

获取原文

摘要

The CEDR-project “X-ARA – Cross-Asset-Risk-Assessment” aims at the development of a comprehensive risk assessment framework for the network level assessment of asset risks and impacts. Based on asset-specific risk assessment (pavements, structures, drainage, etc.) a procedure for the transformation and accumulation of these risks onto network level is an essential part of the project. X-ARA will enable a road administration to execute a risk-based assessment and comparison of different maintenance strategies on network level, and then “overlay” the effects of broad influencing factors to assess “what if” outcomes. In considering a “bottom-up” approach (from object level to network-level) the risk can be calculated and finally cumulated by using asset-specific information, which are available for most of the European road administrations.
机译:CEDR-Project“X-ARA - 交叉资产 - 风险评估”旨在制定全面的风险评估框架,用于网络水平评估资产风险和影响。基于资产特定风险评估(路面,结构,排水等)对网络水平转换和积累这些风险的过程是该项目的重要组成部分。 X-ARA将使道路管理局能够执行基于风险的评估和对网络级别的不同维护策略的比较,然后“覆盖”广泛影响因素的影响,评估“如果”结果的“何时何种”。在考虑“自下而上”方法(从对象级别到网络级别),可以使用资产特定信息来计算风险,最终累计,这些信息可用于大多数欧洲行政管理部门。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号