首页> 外文会议>IABSE Conference on Structural Engineering >Temburong Bridge, Brunei – Independent Design Check
【24h】

Temburong Bridge, Brunei – Independent Design Check

机译:Temburong Bridge,文莱 - 独立设计检查

获取原文

摘要

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. For a project of this significance, an independent category 3 design check has been carried out of the tender design. The check includes structural and geotechnical verification of the 13km long marine viaduct, two cable-stayed bridges across the navigation channels, and three tunnels. The paper describes the objective and process of the independent design check. The checker provides comments to the design drawings and the design basis, and the designer provide replies. The checker has to set up completely independent analysis models. As an example, the finite element models of the pile foundation and the deck of the cable-stayed bridges is presented. For the cable-stayed bridges the construction process and the cable rupture analysis is discussed.
机译:文莱的新30公里Cadangan Projek Jambatan Temburong(Temburong Bridge Project)将与更发达的文莱 - Muara区连接了Temburong的相对较孤立的地区。对于这种重要性的项目,招标设计的独立类别3设计检查已经采用。该检查包括13公里的船舶高架桥的结构和岩土工程验证,导航通道上的两个缆绳座桥和三个隧道。本文描述了独立设计检查的目标和过程。检查器向设计图纸和设计基础提供评论,设计人员提供回复。检查器必须设置完全独立的分析模型。例如,提出了桩基和斜拉桥的甲板的有限元件。对于缆绳停留的桥梁,讨论了施工过程和电缆破裂分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号