首页> 外文会议>International Scientific Conference Urban Civil Engineering and Municipal Facilities >Masonry Construction Remedial Measures in Case of a Multi-Story Housing Facility Caused by Floor Extension Process
【24h】

Masonry Construction Remedial Measures in Case of a Multi-Story Housing Facility Caused by Floor Extension Process

机译:砌体施工补救措施,以防楼层延长过程造成的多层住房设施

获取原文

摘要

This paper presents remedial measures of a multi story housing facility located in Novi Sad, Serbia. The analyzed building was built in traditional masonry construction with precast rib ceiling including unreinforced slab. The damage was caused after the floor extension (overbuilding) process of the existing facility, expressed through cracks on constructive walls. The cause of such damage is a non-analytical approach during upgrade. The work presents a case study of the applied measures at conditions when the material incorporated in the existing part of the building is not of adequate quality. The specificity of this recovery was that during the execution the flats' users remained in their apartments.
机译:本文介绍了位于塞尔维亚诺维萨德州的多层住房设施的补救措施。分析的建筑采用传统的砌体结构,具有预制肋池天花板,包括不良的板坯。在现有设施的地板延伸(过建)过程之后造成损坏,通过建设性墙壁上的裂缝表示。这种损坏的原因是升级期间的非分析方法。该工作提出了一种案例研究,当纳入建筑物的现有部分中的材料并非充分质量时,在条件下对所施加的措施进行了案例研究。这种复苏的特殊性是,在执行期间,公寓的用户仍然存在于他们的公寓。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号