首页> 外文会议>International Conference on Applied Energy >Optimal operation scheduling of a pumping station in east route of South-to-North water diversion project
【24h】

Optimal operation scheduling of a pumping station in east route of South-to-North water diversion project

机译:南北省南水道东路泵站的最佳运行调度

获取原文
获取外文期刊封面目录资料

摘要

The fourth Huaian pumping station is one of the second-stage pumping stations in the South-to-North water diversion project (east route) in China. The operation optimization problem of three pumps in the station is formulated to reduce the electricity cost with the flow demand satisfied. With the characteristics of the problem analyzed, an decomposition method is proposed to reduce the dimensionality of the optimization problem and thus the computation time. Simulation shows the feasibility of proposed method in the reductions of the energy cost. The case study shows that the cost efficiency comes from two aspects: demand shift from the time intervals with high electricity price to those with low electricity price, and the operation mode with high energy efficiency.
机译:第四届淮安泵站是中国南北省北投命项目(东路)的第二阶段泵站之一。该站中三个泵的操作优化问题配制成降低流量需求满足的电力成本。利用分析的问题的特征,提出了一种分解方法来降低优化问题的维度,从而降低计算时间。仿真显示了所提出的方法在减少能源成本中的可行性。案例研究表明,成本效率来自两个方面:需求从高电价的时间间隔转移到电价低的电价,以及具有高能量效率的操作模式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号