Analysis of Whole-Body Vibration Exposure of Drill Machine Operators in Open Pit Iron Ore Mines

机译:露天矿石矿山钻机运营商全身振动暴露分析

获取原文

摘要

The purpose of this study was to evaluate health risks of blast-hole drill operators exposed to whole-body vibration (WBV), based on ISO standard 2631-1. Assessment of health risk associated with the blast-hole drill operators based on ISO 2631-1 criteria is limited. In the current study, operators' WBV exposure was measured in accordance with ISO 2631-1 using a tri-axial seat pad accelerometer at the operator/seat interface. WBV exposure was evaluated along all three orthogonal axes by frequency-weighted RMS acceleration and vibration dose value. Result of the study shows that mean frequency weighted RMS acceleration along Z-axis is dominant as compared to X and Y axis. In the case of VDV exposure, the mean VDV along Z-axis is also higher as compared to X and Y axis however magnitude of mean vector sum of VDV is lower compared to the Z-axis. The predicted health risk of operators based on daily RMS exposure shows that only 3.6 % of drill machine operators were found between the recommended upper and lower limit of health caution zone of ISO standard 2631-1. However, based on VDV evaluation method, all the drill machine operators were found above the recommended upper limit of health caution zone of ISO standard 2631-1. Thus, results observed in this study based on two methods for assessing the health risk of operators' are quite similar depending upon the method applied.
机译:本研究的目的是根据ISO标准2631-1评估暴露于全身振动(WBV)的爆破钻机操作员的健康风险。基于ISO 2631-1标准的爆破孔钻机相关的健康风险评估有限。在目前的研究中,使用在操作者/座椅界面处的三轴座垫加速度计根据ISO 2631-1测量操作员WBV曝光。通过频率加权的RMS加速和振动剂量值沿着所有三个正交轴评估WBV暴露。研究结果表明,与X和Y轴相比,沿Z轴的平均频率加速RMS加速度是显性的。在VDV曝光的情况下,与X轴和Y轴相比,沿Z轴的平均VDV也较高,但是与Z轴相比,VDV的平均矢量和的平均矢量和幅度较低。基于每日RMS曝光的运营商的预测健康风险表明,在ISO标准2631-1的建议的高度和下限之间,只有3.6%的钻机运营商。然而,基于VDV评估方法,所有钻机运营商都在ISO标准2631-1的建议的健康警告区域上方找到。因此,根据两种评估运营商的健康风险的方法观察到这项研究的结果取决于所施加的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号