首页> 外文会议>Sino-Africa international symposium on textiles and apparel >Analysis of The Running State of Guizhou Guangzhao Roller Compacted Concrete Gravity Dam
【24h】

Analysis of The Running State of Guizhou Guangzhao Roller Compacted Concrete Gravity Dam

机译:贵州广州滚轮压实混凝土重力坝运行状态分析

获取原文

摘要

The dam of the Guangzhao hydropower station is a full section RCC gravity dam,The maximum dam height of 200.5 m,crest length of 410 m,is currently the world has been built,in the construction of the highest RCC gravity dam.In order to understand and grasp the Guangzhao hydropower station RCC gravity dam running state,in the buried at different positions of the dam deformation monitoring,stress and strain monitoring,seepage pressure monitoring,such as monitoring instruments,monitoring the running state of the dam.This article through the Guangzhao of RCC gravity dam deformation,stress and strain,seepage in the early monitoring data analysis of osmotic pressure and joint operation,the level of the dam deformation and subsidence deformation is very small,much smaller than design value,the stress and strain monitoring show that the stress and strain measurement value is small,the stability of the dam.Dam section between the transverse crack in open state as a whole,have the effect of the induced slit dam design,the effect is better.Dam and on both sides of the slope rock and alveolar concrete and bedrock joint in good condition,contact state stability.In front of the dam before the main drain uplift pressure intensity coefficient between 0.042 ~0.134,the downstream the residual strength of uplift pressure coefficients between 0.031 ~ 0.214,either upstream or downstream anti-seepage curtain and drainage effect is good.Dam foundation uplift pressure,dam seepage flow and water relation is not obvious.Total water weir measured peak flow of 21.10 L/s,is far less than the dam seepage flow estimation.The dam runing in good condition.
机译:广州水电站的大坝是一个全节RCC重力坝,最大坝高度为200.5米,嵴长度为410米,目前世界已建成,建设最高的RCC重力坝。在订单中了解并掌握广州水电站RCC重力坝运行状态,埋在埋藏坝变形监测,应力和应变监测,渗流压力监测等监测仪器,监测水坝的运行状态。这篇文章广州重力坝变形,应力和应变,渗流在早期监测数据分析的渗透压和联合操作,坝体变形和沉降变形水平非常小,远小于设计价值,应力和应变监测表明应力和应变测量值较小,大坝的稳定性在整个开放状态下横向裂缝之间的稳定性,具有I的效果nduced缝隙设计,效果更好.DAM和坡岩石和肺泡混凝土和基岩接头的两侧处于良好状态,接触状态稳定性。在大坝前面的主漏压力强度系数0.042〜0.134 ,下游隆起压力系数的剩余强度在0.031〜0.214之间,上游或下游防渗窗帘和排水效果是良好的.dam基础隆起压力,坝渗流和水关系不明显。纬度堰测量峰值流动21.10 L / s,远低于坝渗流估计。大坝运行状况良好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号