首页> 外文会议>SPE Middle East Unconventional Resources Conference >Unconventional Gas Simulation Strategy and Workflow
【24h】

Unconventional Gas Simulation Strategy and Workflow

机译:非传统气体模拟策略和工作流程

获取原文

摘要

Numerous technical publications were written in recent years on the effectiveness of reservoir simulation modeling in developing a tight gas resource.These papers question the applicability of existing numerical simulation methodologies to hydraulically fractured unconventional gas reservoirs.The rapidly changing dynamic flow behavior that occurs as fluids move from poor quality reservoir to a highly conductive fracture and then feed into an infinitely conductive wellbore creates complex solutions which are difficult to fully resolve with conventional reservoir simulation techniques.The lack of well to well dynamic interference during early stages of the production stacks the additional uncertainties around connected gas volume to the wellbore,thereby,increasing the chances of sub-optimal investment decision on well spacing,infill wells and number of fracs during the early stages of the field development. This paper proposes a reservoir simulation strategy and the workflow for unconventional gas reser- voirs.The strategy outlines the need to systematically move from simple to complex modeling solutions while creating a learning loop.It proposes an early modeling focus on single wells in small sector models to understand the impact of stimulation and well design related uncertainties.The paper also identifies a learning stage that allows a progression to the next stage of simulation i.e.sector models.The workflow identified in the paper also presents the disadvantages of how an untimely progression from sector to full field modelling can negatively impact final investment decisions and the field development strategy. BP has successfully applied this framework in North America and this strategy has been outlined for reservoir simulation related work in the Sultanate of Oman to develop unconventional gas resources in Block 61.
机译:近年来近年来逐步编写了众多技术出版物,以储层模拟建模在开发紧的气体资源方面的有效性问题。该论文质疑现有数值模拟方法的适用性对液压破碎的非传统气体储层。随着流体移动的迅速改变动态流动行为从劣质的储层到高度导电的骨折,然后进入无限导电的井筒,产生复杂的解决方案,这些解决方案很难用常规的储层模拟技术完全解决。在生产早期阶段缺乏良好的动态干扰堆叠额外的不确定性连接的气体容量与井眼,从而增加了在田间开发的早期阶段井间距,填充井和近距离的井间距,填充井和数量的机会。本文提出了一个储层模拟策略和非传统气体勘察的工作流程。该战略概述了在创建学习循环时系统地从简单到复杂的建模解决方案移动到复杂的建模解决方案的需要。它提出了一个早期建模专注于小型扇区模型的单层井要了解刺激和良好设计的影响相关的不确定性。本文还确定了一个学习阶段,允许进展到下一个模拟IEECORECT模型的阶段。本文中识别的工作流程还呈现了如何从部门进行不平平进展的缺点全场造型可能会对最终的投资决策和现场发展战略产生负面影响。 BP已在北美成功应用此框架,并在阿曼苏丹国苏丹国储层模拟工作中概述了这一战略,以在框61中开发非传统气体资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号