首页> 外文会议>SPE Middle East Unconventional Resources Conference >The Key Role of 4D SeismicProduction Data Monitoring in Heterogeneous Carbonate Reservoir Management to Unwind Master Development Plan Scenarios
【24h】

The Key Role of 4D SeismicProduction Data Monitoring in Heterogeneous Carbonate Reservoir Management to Unwind Master Development Plan Scenarios

机译:4D地震和生产数据监测在异构碳酸盐储层管理中的关键作用,解放硕研发计划情景

获取原文

摘要

One of the main challenges in developing new fields is lack of enough data for reservoir description which in turns add the ambiguity to description of reservoir model and production forecast.Managing PMS (Production Monitoring Subcommittee)as a guideline for Preservation of Hydrocarbon Committee(PHC) uses surveillance and monitoring techniques for controlling the validity of MDP. The studied reservoir is located in new explorated field with heterogeneous carbonate reservoir in southwest of Iran with unique reservoir properties.Include low permeability,high H2S content;high initial reservoir pressure with high quality oil with API gravity of 44,the miscible gas injection project was launched in early production period. The main purpose of the Reservoir management and surveillance is integrating the well flow parameters and further technical data from various sources in order to apply the technical experience and software skills to enhance the production performance.The reservoir management and surveillance procedures are approaches for data acquisition for creative analysis and interpretation of data to exploit the utmost value from each well,level and the whole field. The main tools to monitor the field as three categories, i.the different types of well testing,data acquisition and crude sampling, ii.The methodology and softwares that will be utilized to analysis the data and perform the relevant studies to evaluate and optimize the wells and field performance. iii.The gas injection monitoring procedures. All the foreseen activities for Reservoir surveillance will be presented and discussed quarterly within the Production Monitoring Subcommittee or PMS.The main objective of this study is to provide the approaches,procedures and sequence of activities to be carried out in field in order to effectively monitor and optimize the field performance.
机译:开发新领域的主要挑战之一是储存器描述的数据缺乏足够的数据,这反过来又增加了对水库模型和生产预测的描述的歧义。管理PMS(生产监测小组委员会)作为保存油气委员会(PHC)的指导方针使用监控和监控技术来控制MDP的有效性。学习的水库位于伊朗西南部的新探索领域,拥有独特的储层特性。包括低渗透性,高H2S含量;高质量的储层压力高,具有44的高质量重力,可混溶气体注射项目在早期生产期间推出。水库管理和监测的主要目的是将井流参数和来自各种来源的进一步技术数据集成,以便应用技术经验和软件技能来提高生产性能。水库管理和监测程序是数据收购的方法利用每个井,级别和整个字段利用最大价值的数据创造性分析和解释。将现场监视为三类的主要工具,I。不同类型的井测试,数据采集和粗制采样,II。将用于分析数据的方法和软件,并执行相关研究以评估和优化的相关研究井和现场性能。 III。气体注入监测程序。在生产监测小组委员会或PMS中季度将讨论和讨论储层监测的所有预见活动。本研究的主要目标是提供在现场进行的方法,程序和序列,以便有效监测和优化字段性能。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号