首页> 外文会议>Nigeria Annual International Conference and Exhibition >Cost Effective Appraisal Strategy Using Decision Tree Analysis for Optimal Field Development Planning
【24h】

Cost Effective Appraisal Strategy Using Decision Tree Analysis for Optimal Field Development Planning

机译:利用决策树分析进行最佳现场开发规划的经济效益评估策略

获取原文
获取外文期刊封面目录资料

摘要

Project B, consisted of five discrete subsurface elements; Remaining developed volumes, Infill opportunities, Resources in THIN-BED and Exploration prospects. These subsurface elements were at different levels of technical maturity and were planned into a single project maturity timeline with shared i(mpact on facilities. Based on level of technical maturity, two of the subsurface elements (THIN-BEDs, and Exploration prospects) were considered as requiring an appraisal plan to further mature their development options. In anticipation of "lower for longer" oil price scenario, the appraisal strategy for the discrete elements was integrated and designed utilizing decision tree analysis. The appraisal strategy was developed for the immature subsurface elements, consisting of a variety of appraisal methods, each cost effectively geared towards fit for purpose data acquisition to mitigate the key uncertainties and enable further oil development in the field. Decision tree analysis for each of the immature subsurface elements, describing the possible outcomes with associated probability of success, was performed including fit for purpose economic analysis to understand & decide the value add and timing of appraisal. This integrated appraisal strategy including decision tree analysis; provided the basis and strong logic to decide whether the appraisal is worthwhile and when is the most optimal time to do it. This methodology demonstrates how the quality decision around field development planning could be made by using decision tree analysis to evaluate the value of the components, using associated uncertainty around estimated ultimate recovery. Furthermore, this analysis also is utilized to understand the timing of appraisal vis-a-vis the overall field/project development.
机译:项目B,包括五个离散地下元素;剩下的卷,填充机会,薄床和勘探前景中的资源。这些地下要素是不同层次的技术成熟度,并计划到单个项目的成熟时间表与共享I(MPACT的设施。根据技术成熟程度,两个地下元素(薄床,勘探前景)进行了审议正如要求评估计划进一步成熟他们的发展方案。在预期“较长较长”的石油价格方案中,采用决策树分析对离散元素的评估策略进行了整合和设计。为不成熟的地下元件开发了评估策略由各种评估方法组成,每个成本都有效地旨在适合目的的数据采集,以减轻关键的不确定性并在该领域实现进一步的油开发。每个未成熟的地下元件的决策树分析,描述了相关的相关结果成功的概率,包括适合于经济A的适合为了理解和决定评估的价值和时间。这种综合评估策略包括决策树分析;提供了基础和强逻辑来决定评估是否值得,何时是最优越的时间。该方法展示了如何通过使用决策树分析来评估组件的值的现场开发规划的质量决策如何使用估计的最终恢复周围的相关不确定性来进行。此外,该分析还用于了解鉴定vis-a-vis的时间的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号