首页> 外文会议>SPE EP Health, Safety, Security, and Environmental Conference >The Implementation and Automation of Effective Key Performance Indicators to Manage Process Safety and Asset Integrity Risk: A Power Company Case Study
【24h】

The Implementation and Automation of Effective Key Performance Indicators to Manage Process Safety and Asset Integrity Risk: A Power Company Case Study

机译:有效关键绩效指标管理和自动化管理流程安全和资产诚信风险:电力公司案例研究

获取原文

摘要

This paper introduces a program successfully designed and implemented within ScottishPower, a major UK Utility. The program focuses on the development of an integrated Process Safety Management system. The program has since been developed, tailored and implemented in 3 European based Offshore E&P operations. The program is based upon adopting UK HSE guidance on developing process safety indicators (HSG 254) and supported by numerous other international standards including ISO55000:2014 (Asset Management) and API Recommended Practice (RP) 754, Process Safety Performance Indicators; the program has driven positive change through awareness and understanding of Process Safety and asset Integrity risk at every level of staff and contractor in the organization. Central to the program is the development of quantitative Key Performance Indicators from a Bow Tie Hazard identification and analysis process. This paper explains the methodology of how Bowtie theory can be used to develop leading KPIs covering an entire asset base; illustrated with a walk through of relevant Hazards, Bow Ties and KPIs. The paper will also articulate how ScottishPower utilized the KPI data within a near time KPI dashboard system, to enable staff at all levels to understand the current status of the risk control barriers across all assets regardless of age, type and level of automation. This innovative approach to KPI development and management enables ScottishPower to identify Safety, Human and asset risks in real time and to implement proactive solutions at facility and boardroom level before critical barriers fail. This paper will be of particular value to those who are commencing implementation of a process safety management system or those who have a well-established system but feel that their current approach to KPI development is not portraying an accurate, timely risk profile of risks associated with human factors, safety culture, contractor management, ageing equipment, drilling and completions.
机译:本文介绍了一项成功设计和实施的计划,在苏格兰人苏格兰,这是一个主要的英国公用事业。该计划侧重于开发综合处理安全管理系统。该计划已在3个欧洲的离岸E&P操作中制定,量身定制和实施。该计划是基于采用英国HSE指南在开发过程安全指标(HSG 254)的指导下,并由众多其他国际标准提供支持,包括ISO55000:2014(资产管理)和API推荐练习(RP)754,流程安全性能指标;该计划通过对本组织中每个员工和承包商的过程安全和资产诚信风险的认识和理解来推动了积极的变化。该计划的核心是从船首领带危险识别和分析过程中发展定量关键绩效指标。本文解释了Bowtie理论如何用于开发领先的KPIS覆盖整个资产基础的方法;用散步通过相关的危险,弓形和kpis说明。本文还将阐明苏格兰人如何在近期KPI仪表板系统内使用KPI数据,以使所有级别的员工能够了解所有资产风险控制障碍的现状,无论年龄,类型和自动化程度如何。这种创新的KPI开发和管理方法使苏格兰人能够实时识别安全,人力和资产风险,并在临界障碍失败之前在设施和会议室内实施积极主动解决方案。本文将对那些开始实施过程安全管理系统的人或那些拥有完善的系统的人来说是特别的价值,而是认为他们目前的KPI开发方法没有准确,及时的风险风险概况人为因素,安全文化,承包商管理,老化设备,钻井和完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号