Research on Construction Schedule Management Based on BIM Technology

机译:基于BIM技术的施工进度管理研究

获取原文

摘要

The construction schedule management in the traditional mode will be affected by the natural environment, the objective environment and the subjective environment, leading to the interruption or obstruction in the construction process. But in the actual construction process, through assisting the BIM model and BIM5D software in the construction schedule management, not only ahead of schedule can be aware of the next step schedule of the required resource requirements, equipment demand and capital requirements; but also in the actual construction process Timely monitoring the progress of the completion of the percentage of the plan, the actual use of the amount of funds accumulated and the amount of budgetary funds deviation and so on; at the same time in the actual construction process can form a set of complete construction schedule management mode that timely supervising the construction quality and safety issues, recording defects on the spot, integrating data and associating model, timely rectifying or Repairing defects, and then checking the project.
机译:传统模式中的施工时间表管理将受到自然环境,客观环境和主观环境的影响,导致建筑过程中断或阻碍。但在实际的施工过程中,通过协助BIM模型和BIM5D软件在施工时间表管理中,不仅提前计划可以了解所需资源需求,设备需求和资本要求的下一步时间表;而且还在实际的建设过程中及时监测完成计划百分比的进展情况,实际使用资金累计金额和预算资金偏差等等;同时在实际施工过程中可以形成一套完整的施工时间表管理模式,及时监督施工质量和安全问题,记录现场缺陷,集成数据和关联模型,及时整流或修复缺陷,然后检查该项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号