首页> 外文会议>Scientific-Technical Conference on Material Problems in Civil Engineering >Water tower materials experimental investigations and technical condition assessment after 55 years of exploitation
【24h】

Water tower materials experimental investigations and technical condition assessment after 55 years of exploitation

机译:水塔材料实验研究和55年剥削后的技术条件评估

获取原文

摘要

The purpose of this work was to define the technical condition of the water tower building and an indication of the ways of repairing and strengthening the structure. The function of the building is to provide water under high pressure to water supply installation for a water railway distribution station. The structure was built in 1959. The building consists of four floors above the ground and the basement. The main masonry structure is made of brick casted on lime and cement mortar. Each story is separated by reinforced concrete ceilings constructed as two-way slabs supported by beams. A circumferential reinforced concrete water tank is situated on the top floor. The tank consists of two chambers with the total volume of 250 m3. Reinforced concrete stairs are located around the circumferential wall of the building and provide service and technological communication in the building. The roof is constructed with reinforced concrete panels. The scope of the study includes a technical condition assessment of masonry walls, reinforced concrete floors (slabs and beams), stairs, the tank and the dome. For this reason, experimental researches on structural elements were performed. Researches of structural concrete include destructive tests made on drilling trial elements and non-destructive tests, to qualify mechanical properties of the material. Supplementary tests concern the humidity measurements and concrete alkalinity examination. For detection of rebar in structural elements, scanning of the specimen surface was performed and the concrete cover was removed in several places. For brick walls the main attention was focused on moisture content measurements. Experimental investigations and on-site inspections made it possible to assess the level of consumption of individual elements and durability of the structure. On this basis, main guidelines for necessary repairs and strengthening of structural elements which endanger the safety of exploitation were proposed.
机译:这项工作的目的是定义水塔建筑的技术条件,并指示修复和加强结构的方法。该建筑的功能是为水铁路配送站提供高压的水。该结构于1959年建于1959年。该建筑由地面上方的四层和地下室组成。主要的砌体结构由砖块上的砖块制成,在石灰和水泥砂浆上。每个故事都是通过由梁支撑的双向板坯构造的钢筋混凝土天花板分开。圆周钢筋混凝土水箱位于顶层。坦克由两个腔室组成,总体积为250 m3。钢筋混凝土楼梯位于建筑物的圆周壁周围,并在建筑物中提供服务和技术通信。屋顶采用钢筋混凝土板构造。该研究的范围包括砌体墙壁,钢筋混凝土地板(板材和梁),楼梯,坦克和圆顶的技术条件评估。因此,进行了对结构元素的实验研究。结构混凝土的研究包括对钻井试验元素和非破坏性测试的破坏性测试,以限定材料的机械性能。补充试验涉及湿度测量和混凝土碱度检查。为了检测结构元件中的钢筋,进行样本表面的扫描,在几个地方移除混凝土盖。对于砖墙,主要注意力集中在水分含量测量上。实验研究和现场检查使得可以评估个体元素的消费水平和结构的耐久性。在此基础上,提出了危害剥削安全性的必要维修和加强结构元素的主要准则。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号