DEEPWATER PIPELINE CHALLENGES

机译:深水管道挑战

获取原文

摘要

With the ever-increasing demand of energy in the country, the Indian exploration and production is now compelled to move into deepwater frontiers. The country's energy reserve is getting exhausted with drying shallow water assets and the mainland is already overwhelmed with the pressure of sustaining the world's second largest population. Therefore, "the upstream oil and gas fraternity of the country" has to now enter "less explored" Indian deepwater block which has already started with the launch of the NELP block by the government. Although, the world has moved into deepwater long back, the Indian industry is still developing the ways and means to tackle the challenges involved in deep water. This paper presents the insights into design and installation of deepwater pipelines along with case study of Middle East to India Deepwater Pipeline (MEIDP) of M/s SAGE, which shall be laid at a maximum water depth of 3450 m. This paper broadly elucidates the challenges in designing the deepwater pipelines such as requirement of thick-walled line pipes to sustain collapse due to external over-pressure and tensile stresses generated due to installation forces, pipeline route selection and optimization, geo-hazard assessment & mitigation, design against fault line crossings/seismic design, free span, repair systems, seabed intervention etc. It also covers the additional manufacturing & testing requirements including tighter tolerances for line pipes suitable for deepwater installations. It also highlights the deepwater installation capabilities of Pipe lay Barges for the laying of pipeline in the deepwater to ultra-deep waters along with new evolving testing and commissioning philosophies. This paper intends to bring awareness among the "oil and gas fraternity" regarding challenges involved in deep water pipelines with respect to design, installation etc.
机译:随着全国能源需求不断增加,印度勘探和生产现已被迫进入深水边界。该国的能源储备正在用干燥的浅水资产和大陆疲惫不堪,已经不堪重负,以维持世界第二大人口的压力。因此,“该国上游石油和天然气兄弟会”现在必须进入“较少探索”的印度深水块,已经开始由政府推出NELP块。虽然,世界已经进入深水,印度行业仍在开发解决深水中挑战的方式和手段。本文介绍了深水管道的设计和安装以及中东地区的案例研究,印度深水管道(Meidp)的M / S Sage,应以3450米的最大水深铺设。本文广泛地阐明了设计深水管道等厚壁管道要求,厚壁管道的要求由于安装力,管道路线选择和优化,地理危害评估和减灾而产生的外部过压和拉伸应力导致的厚壁管道崩溃。 ,针对断层线束的设计/地震设计,自由跨度,修复系统,海底干预等。它还涵盖了额外的制造和测试要求,包括适用于深水装置的线管的更严格公差。它还凸显了管道铺设驳船的深水安装能力,以便在深水中铺设到超深水处,以及新的不断变化的测试和调试哲学。本文旨在提高关于设计,安装等深水管道挑战的“石油和天然气兄弟会”的认识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号