首页> 外文会议>Asia International Symposium on Mechatronics >Availability evaluation of wind farms considering the influence of vertical wind shear
【24h】

Availability evaluation of wind farms considering the influence of vertical wind shear

机译:考虑垂直风剪的影响的风电场可用性评价

获取原文
获取外文期刊封面目录资料

摘要

The probability distribution of wind speed and availability of wind farms are investigated considering the vertical wind shear. Wind speed at extended height (60 m) was generated from that of reference height (10 m) through the Power-law Process. The least square (LS) method, maximum likelihood estimation (MLE) method and modified method are used to estimate the parameters of Weibull distribution. Then the goodness-of-fit and wind energy characteristic indices are deduced. It shows that MLE and modified MLE method are superior to LS method in parameter-estimating, and wind speed distribution at different height changes with wind shear. The rationality and effectiveness of the modified method are verified from the case study.
机译:考虑垂直风剪切,研究了风力速度和风电场可用性的概率分布。通过电力法工艺从参考高度(10米)的延长高度(60μm)的风速。最小二乘(LS)方法,最大似然估计(MLE)方法和修改方法用于估计Weibull分布的参数。然后推导出健康和风能特征指数。它表明,MLE和改进的MLE方法优于LS方法在参数估计中,并且在不同高度的风速分布随风剪的变化。从案例研究中验证了修饰方法的合理性和有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号