Identifying Geothermal Power Plant Institutional Barrier and External Factors in Indonesia

机译:识别印度尼西亚地热电厂机构障碍和外部因素

获取原文

摘要

Geothermal Power Plant (GPP) installed capacity has not been optimally optimized in Indonesia, although Geothermal is abundant. In fact, the institutional barrier and external factors are amongst factors determining GPP utilization and maintenance. To realize such potential, the Government of Indonesia (GoI) has conducted some initiatives to improve this condition. Particularly, it applies better and proper incentives such as fiscal incentives and conducts Preliminary Survey and Exploration Assignment (PSPE) to properly assesses the potential. The output of PSPE will provide more credible data to ease the risk and cost of the geothermal exploration phase. But there is also an inherent danger in the exploration phase, and the exploration cost tends to rise, makes the GPP less feasible. The trend of declining coal price is also a threat to GPP since it is more favorable to generate electricity from the cheap resource (coal-fired power plant). Thus, in order to lower the risk, technology adoption, and acquisition to reduce the cost and risk associated with exploration is essential. On the other hand, from the GoI's view, Trilemma energy policy applied in Indonesia is the essential/basic consideration to regulate the energy business. For renewable energy, it is emphasized on the affordability aspect, thus in analyzing the institution's policy, the set of the power purchase agreement and related rules remain as the decisive factors. The paper attempts to explain and assess the government initiatives on the issues mentioned above, by using SWOT and Policy Gap analysis to describe the Indonesian geothermal energy condition and analysis. Thus, this paper is constructed to provide an alternative solution to mitigate and ease such institutional barriers and external factors in Indonesia's GPP.
机译:虽然地热量丰富,但地热发电厂(GPP)装机容量尚未在印度尼西亚进行最佳优化。事实上,制度障碍和外部因素是确定GPP利用和维护的因素。为了实现这种潜力,印度尼西亚政府(GOI)进行了一些改善这种情况的举措。特别是,它适用更好,适当的激励措施,例如财政激励措施,并进行初步调查和勘探分配(PSPE),以适当地评估潜力。 PSPE的输出将提供更可信的数据,以缓解地热勘探阶段的风险和成本。但勘探阶段也存在固有的危险,勘探成本趋于上升,使得GPP不太可行。煤炭价格下降的趋势也是对GPP的威胁,因为它更有利于从廉价资源(燃煤发电厂)产生电力。因此,为了降低风险,技术采用和收购,以降低与勘探相关的成本和风险至关重要。另一方面,从Goi的看法,在印度尼西亚的Trilemma能源政策是规范能源业务的必要/基本考虑。对于可再生能源,强调了负担能力方面,从而在分析机构的政策时,该集团的电力购买协议和相关规则仍然是决定性因素。本文试图通过使用SWOT和政策差距分析来描述上述问题的政府倡议,以描述印度尼西亚地热能量条件和分析。因此,本文构建为提供一种替代解决方案,以减轻和缓解印度尼西亚的GPP中的这种制度障碍和外部因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号